Loading...
Park West CC(3)-LR000105GEOTECNNICALAND ~ R r-i I I p ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 35 REG PROJECT NO. 6080 SAMPLE DATE: 01-05-00 TECHNICIAN: J. Maldonado CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Floor Slab: C.5 - 2.8 60/300 2 Floor Slab: C.7 - 6.8 160/300 3 Floor Slab: C.3 - 10.3 210/300 Design Information TXI 47 4000 J Test Results 1 1494 01-12-00 7 121130 4290 1494 02-02-00 28 164190 5810 1494 02-02-00 28 151670 5360 5590 2 1495 01-12-00 7 125280 4430 1495 02-02-00 28 165990 5870 1495 02-02-00 28 172920 6120 6000 3 1496 01-12-00 7 135180 4780 1496 02-02-00 28 179670 6360 1496 02-02-00 28 179870 6360 6360 Cylinder Data ~!i:~ ' ~;~*~ ~;;~ "3;;' ~'*' ~ !~ ~ ~ ~ ~' '~'<~:~ ~?~ ::::::::::::::::::::::: ......... ::: ......... !~t/t~/?~;~t~,~ ~ ~ i!J~. TJ~E{~{~ 1 1494 5.0 8:05 am 30 53 N/A 1485355 2 1495 5.0 9:20 am 38 55 N/A 1485469 3 1496 4.5 10:10 am 42 57 N/A 1485531 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/cav/rt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ~ R I--1 U F=:a ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 35 REG PROJECT NO. 6080 SAMPLE DATE: 01-05-00 TECHNICIAN: J. Maldonado CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Floor Slab: C.5 - 2.8 60/300 2 Floor Slab: C.7 - 6.8 160/300 3 Floor Slab: C.3- 10.3 210/300 Design Information I TXI 47 4000 I Test Results 1 1494 01-12-00 7 121130 4290 1494 02-02-00 28 1494 02-02-00 28 2 1495 01-12-00 7 125280 4430 1495 02-02-00 28 1495 02-02-00 28 3 1496 01-12-00 7 135180 4780 1496 02-02-00 28 1496 02-02-00 28 Cylinder Data 1 1494 5.0 8:05 am 30 53 N/A 1485355 2 1495 5.0 9:20 am 38 55 N/A 1485469 3 1496 4.5 10:10 am 42 57 N/A 1485531 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/cav 2424 STUTZ DR. · SUITE 400 ° DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019