Loading...
Park West CC(3)-LR 991227GEOTECHNICAL AND J~j I==J I'-'1 U I=~ ENVIR. ONPIENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 27 REG PROJECT NO. 6080 SAMPLE DATE: 12-27-99 TECHNICIAN: B. Pitts CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Piers: D-12, D.3-12, D.7-12, E-12, E.3-12 10/37 Design Information J ' ' TXI ~ 45 3000 Test Results 1 1242 01-03-00 7 90240 3190 1242 01-24-00 28 132650 4690 1242 01-24-00 28 137480 4860 4780 1242 Hold Cylinder Data J'~'~ :i 1242 4.50 12:45 PM 60 50 N/A 1480606 I Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019 GEOTECHNICAL AND ~ R r--i U ~ ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 27 REG PROJECT NO. 6080 SAMPLE DATE: 12-27-99 TECHNICIAN: B. Pitts CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Piers: D-12, D.3-12, D.7-12, E-12, E.3-12 10/37 Design Information TXl 45 3000 Test Results 1 1242 01-03-00 7 90240 3190 1242 01-24-00 28 1242 01-24-00 28 1242 Hold Cylinder Data ....... i ~i~~* I¢t~ ~ ~'~;~" ' ~:i ......... i' .... .... ~ ..... : ..... , ......................... ,~ ~ : ~ ~ I 1 1242 4.50 12:45 PM 60 50 N/A 1480606 Distribution: (1) (1) (1) (1) (1) (1) (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood McFadden & Miller, Inc./ Mr. Jon Jacobson Meinhardt & Quintana/ Mr. David Meinhardt Halff Associates/Mr. Patrick Acker City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt 2424 STUTZ DR. · SUITE 400 ° DALLAS, TX 75235 ° TEL [214] 350 5600 ° FAX [214] 350 0019