ST9704-AG 990608 ;T FORM CITY COUNCIL MEETING: June 8, 1999 ITEM # Z ~ ITEM CAPTION: Consider approval of Change Order #3 to the Denton Tap Road Project #ST94-01 in the amount of $230,520.00 to Rebcon, Inc. for the construction of W. Town Center Drive (2"d High School Access Road); and aufi~orizing the Mayor to sign. APPROVED CiTY COUNCIL DATE . SUBMITTED BY: Kenneth M. Griffin, P.E. TITLE: Director of Engineering/Public Works STAFF COMMENTS: In an attempt to expedite the construction of the 2~a High School Access Road and at the direction of Council, staff contacted Rebcon, Inc., the contractor currently working on Denton Tap Road, about a change order to their project. Rebcon has been very responsive during the course of the construction of Denton Tap Road and basically has kept the project on schedule. After initial discussion with the representative of Rebcon, Inc., there was an indication that it would be possible to execute a change order such that the 2"d High School Access Road could be completed sometime in early August or possibly before the beginning of the school year. The wall and road humps did add some additional cost to the project, however, from a safety standpoint both of those items have been deemed to be necessary. Staff is currently working with the property owner in finalizing the necessary right-of-way and dealing with the utility companies to bring about the relocations so that the project can proceed. In an attempt to expedite the project and hopefully have it constructed prior to the school year, staff recommends the award of Change Order #3 to Rebcon, Inc. in the amount of $230,520.00 for the construction of the 2"d Access to the High School. Staff will be available to answer questions at the Council meeting. ~~ ~ BUDGET AMT. $ AMT. EST. $ + X-BID $ ~ FINANCIAL C NTS: Funds for is construction project are available in the Street CIP Account. ~ D . INITIALS: V~ FIN. REVIEW: ~ CITY MANAGER REVIEW: en eues orm - evise Document Name: #06086 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Denton Tap Road Project # ST 94=01 CONTRACTOR: Rebcon Inc. OWNER: City of Coppell CHANGE ORDER NO.: 3 (Addition of 2~ High School Access) DATE: 6/8/99 Item Description {~3antity Ullit Unit Price Total .ADD: I 1 Uncl Street Excavation 1644.0 CY 7.00 11,508.00- 2 Controlled Density Fill 112.0 CY 6.00 672.00 4 ROW Prep 5.6 STA 3,100.00 17,360.00 16 6" Lime Stub Subgrade 3250.0 SY 1.50 4,875.00 17 Lime 49. 0 TON 92.019 4, 508. O0 , ~..,.18 8" 300011 Reinf. Conc St Pvmt 156.0 SY 30.00 4,680. O0,,- w/curb 20 4" 3000# Conc Sidewalk 530.0 SY 21.00 11,130.00 28 Refi 4" White Pvmt Markers 40. 0 EA 5. 80 232. O0 32 3" Sch 40 PVC Conduit 90.0 LF 4.00 360.00- 55 Adjust Exist. SS Manhole 2.0 F_,.4 500. O0 1,000. O0--- New ROW Prep 3.5 STA 9,600.00 33,600.00 ~ i,~,,k~aw/Rem Conc Curb&Gutter 298.0 LF. 7.50 2,235.00" Butt Joint 298. 0 LF 4. O0 1,192.00- 6" 300011Reinf. Conc St. 2832.0 SY 29.00 82,128.00 Pvmt w/curb Road Humps 2.0 ti4 9, 500. O0 19, 000. O0~- Pavestone Retaining Wall 680. 0 LF 53. O0 36, 040. 00~ Total Revision to Contract Amount $230,520. O0 Previous contract amount $3,677,038.15 Net increase in contract amount $ 230,520.00 Revised contract amount $3,907,558.15 Net increase in contract time of completion '0- Revised Contract time of completion 290 Working Days Special Conditions: 1. Prices exclude: utility adjustments or relocations; light pole relocation; grass; Irrigation; relocate trees. 2. The Pavestone Wall Unit Price is based on constructing a flex base footing in lieu of a concrete footing. Denton Tap Road Project ST 94-01 Change Order #3 6/8/99 Page 2 The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by mason of this revision to the Contract Recornmendediby/City Engineer Date .