Loading...
Park, Peter-CS 961126 NATHAN D. MAIER CONSULTING ENGINEERS. INC. November 26, 1996 Mr. Kenneth M. Griffin, P.E. Assistant City Manager ? Director of Public Works City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Subject: Review Status of 18.9 acre Sandy Lake Road Property Elm Fork Trinity River Floodplain Reclamation Dear Mr. Griffin: I am inquiring about the review status for the project referenced above. The two associated floodplain studies were submitted to the City of Coppell on August 12, 1996. Over three months have passed now and outstanding issues apparently remain. Please let us know what needs to be done to resolve these issues. If you so desire, I will be happy to meet with you and your review consultant such that City approval may be obtained. We would like to proceed as soon as possible with the request for a Conditional Letter of Map Revision and the request for a Corridor Development Certificate. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. Mark D. Walter, P.E. Three NorthPark / 8800 N. Central Expwy. / Suite 300 / Dallas, Texas 75231 / (214) 739-4741