Loading...
Park West CC(3)-CS000229 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Carolyn Bebermeyer, Senior Account Technician Mike Martin, P.E., Assistant City Engineer /7~//~ Date: February 29, 2000 Refund of fees for Parkwest Commerce Center Lot 1R-2, Block 2 (Daryl Flood Warehouse) I received a phone call from Ray Flood of Daryl Flood Inc. requesting a refund for a fire meter. It has been determined that the fire meter is not needed for this ~develoPm?nt: I have enclosed a copy of the Development Fee Worksheet for this development showing the amounts which need to be refunded. The total refund should be $ 4,422.20. I have also attached a copy of the Journal Entry and back up information showing when the fees were paid. Please mail check to: Attn.: Ray Flood % Daryl Flood Warehouse Movers 2009 Country Club Drive Carrollton, TX 75006 If you have any questions concerning this memo please let me know. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" DEVELOPMENT FEE WORKSHEET PROJECT: Park West Commerce Center Lot 1R-2, Block 2 - Phase I DATE: 10/13/1999 _.~ Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): Total #: 18.5 1 - 2 inch = 8 I - 2 inch = 8 0 = 0 1 - 8 inch = 2.5 ESU's @ $450.00 ea. (100% due prior to Council.approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $192.05 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) .~ Irrigation/Fireline Water Meter Fee: Total 0: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ (f00% due prior to issuance of water meters) $192.05 $0.00 $3,217.20 Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. ESU's ESU's ~(~ 2_~ ESU's $,8,325.00 $1'5o.9o $192.05 $192.05 $0.00 $3,217.20 $35.00 $60.00 $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $50.00 CITY OF COPPELL J.E. NO.. Prepared by *~ JOURNAL ENTRY Appro,ed by POSTED BY: FUND; DATE:/o-J'~-ctq, DATE: DESCRIPTION ACCOUNT DR. CR. NUMBER ~___,,.,,..~ ~,_ ~ ~-~o9~ I !~.~ ~~ ,,~,, ~. ~. ~- ~o ~-~ ~-.. ~~.. J The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 RO. Box 478 Coppell, Texas 75019 972-462-0022 October 13, 1999 Todd J'ackson HalffAssociates 8616 Northwest Plaza Dr. Dallas, TX 75225 RE: Park West Commerce Center Lot IR-2, Block 2 - Phase I Fee Assessment Letter Dear Mr. Jackson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amo.unt of $22,711.96 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Park West Commerce Center Lot 1R-2, Block 2 - Phase I Date: 10/13/1999 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee ~t~'° $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee ta~'at~ $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) ~,~o $192.05 (100% due at Iss_uance of Water Meter) Water Meter Fee (Irrigation/Fireline) t~ ~o $3,409.25 -- (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) ~'$~ $35.00 (100% due at Issuance of Water Meter) IrrigationYFireline Meter Deposit ~'~.'3~ $60.00 (100% due at Iss-ance of Water Meter) Wastewater Impact Fee to~'~o $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee c,~'~ $50.00 (100% duemt Issuance of Building Permit) Utility Final Inspection Fee tat,~, ~ $50.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $10,786.96 $10,786.96 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee hfformation not Available II TOTAL $26,658.26 I TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $22,711.96 DEVELOPMENT FEE WORKSHEET PROJECT: Park West Commerce Center Lot 1R-2, Block 2 - Phase I DATE: 10/13/1999 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's I - 2 inch = 8 ESU's 0 = 0 ESU's I - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% ~lue prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single ~amily due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $192.05 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ -' Total #: 1 Fireline Meter(s) @ (~'00% due prior to issuance of water meters) $192.05 $o .oo $3,217.20 Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% ~ue prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% '~lue prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. $,8,325.00 $150.00 $192.05 $192.05 $o.oo $3,217.20 $35.00 $60.00 $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% '~lue prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $50.00 $50.00 Page DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits _ the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $10,786.96 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 RoADWAy IMPACT FEE CALCULATIONS PROJECT: DATE: Par~ West Commerce Cen~er Lot 1R-2, Block 2 - Phase I 10/I$/1~99 I~OADWA¥ IMPACT FETE: Service Area * Category ** ! ~nd Use ** B~i!ding Area (sO Development Un'ts ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** : Roadway Impact Fee due -- (Development Units) x (Vehicle Miles per Development UniO x (Fee per Vehicle Mile) I0 General Light Industrial 135,685 135.69 I.~ $43,147.83 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 75 % (Reference Memo to City Manager Dated October 5, 1999) Total Credit $32,360.87 ~::~:~:::i*::~:: ','": '.: ' ~: ": ~..':'~i~.-'~-:.;.'~:."..'~i~.:.:.*.'~?.'~:~?~' ': "' ':.:i.: ' ~' "'.i~ · ......................... I'" II From 042462 Dollars ~E DARYL FLOOD, INC. 2~39 COUNTRY CLUB DRIVE CARROLLTON, TX 75006 (972) 416-3385 IMPACT FEES 10/15/99 $26,658.26 REMITrANCEADVICE-OETACHANDRETAINFORYOURRECORDS Flfq'ST NATIONAL SANK OF PARK CmF.~ 32.1~12 ' DARYL FL(]DD, INC' " 2009 COUNTRY CLUB DRIVE CARROLLTON, TX 75006 (972) 416-3385 PAY EXACTLY 'D,4Eh'"[~ SIX THOUSAND SI]~ ~JNDI~ED FIFTY EIGHT DOLLARS . - · · VOID AFTER 180 [~AYS PAY · . ' ' . · _ ~. rOmE CITY OF COPPELL -' ORDER P.O. BOX 478 -' OF COPPELL, TX 75019 0329:3"" ."OO32q31" m:&&&O&k325m: O0 2?OF=