Loading...
Park West CC(3)-CS 991122 (2)November 22, 1999 RO. Box 478 Coppell, Texas 75019 972-462-0022 James Corer Tri Dal LTD. 540 Commerce Southlake, TX 76092 Flood Two Box Culvert Park West Commerce Center, Lot 1R-2, Daryl Flood Project Dear James Cofer: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, November 20, 1999. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a check for $120.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincerely, Larry Davis Construction Inspector CC: Finance Department Debi Ingram, Engineering Secretary Pcrocker/subdivsn/parkwest/lotlR-2/ovrflme2 8174818195 From-TRI OAL L], Nov-16-Og 06:16am T-068 PO1/O1 F-?$8 540 Commerce Southlake, TX 76092 Metro (817) 481-2886 Fax (817) 481-8195 Larry Davis ConstTucrJon Inspector City of Coppeli gererence: Saturday Worl~ Subject: Flood Two Box Culvert Project ]Vlr. Davis, Please accept_thls letr~r as notification that Tri Dal LTl. would like to work this Saturday, The _~_~of November on the above mentioned prolecL Please call me if' you have any questions or concerns sir. ~es Pro )ectfully, es Corer ecc Manager