Loading...
Park West CC(3)-CS 991115November 15, 1999 P.O. Box 478 CoppelI, Texas 75019 972-462-0022 James Cofer Tri Dal LTD. 540 Commerce Southlake, TX 76092 Flood T~, ~: Cul¥~rt Park West Commerce Center, Lot 1R-2, Daryl Flood Project~ Dear James Cofer: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, November 13, 1999. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a check for $120.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Construction Inspector CC: Finance Department Debi Ingram, Engineering Secretary Pcrocker,'subdivsn/parkwest/Iot 1R-2/ovrfime I Nov-lO-gg Og:3Zam From-TRI DAL L~. 8174818195 817'4818195 T-936 P.01/01 F-361 540 Commerce . Southlake, TX 76092 LTD. Metro (817) ~181-2886 Fax (817) 481-8195 Larry Davis Cons:ruction Inspector City of Coppell Reference: Saturday Work Subject: Flood Two Box Culverz Prolect Mr. Davis, Please accept this letter as notification that TH Dal Lzd. would like to work ~his Saturday, ~he 13th of November on the above mentioned project. Please call me If you have any questions or concerns sir. Respectfully, lames Corer Project Manager