Loading...
Park West CC(3)-CS 990706July 6, 1999 P.O. Box 478 Coppell, Texas 75019 972-462-0022 FILE James A. Koch, Jr., P.E. Pacheco Koch Consulting Engineers, Inc. 9401 LBJ Freeway, Suite 300 Dallas, TX 75243 RE: Park West Commerce Center Lot 1R-2, Block 2, Box Culvert Plans Dear Mr. Koch: The City of Coppell has reviewed the referenced plans and has the following comments to offer: You will need an approved floodplain permit prior to doing any work within the 100-year floodplain limits. At the completion of construction, a 2-year 50% maintenance bond will be required for the box culvert and a 2-year 100% maintenance bond will be required for erosion control. Any landscaping or irrigation systems disturbed during construction must be replaced with equal or better. Provide the TxDOT details for the proposed box culvert in the plans. An additional manhole will be required such that the spacing between access is not greater than 1000 feet. The preferred location would be at the pipe size change to localize minor losses in the culvert. What happens to the surface drainage from the east and west? Consider adding a surface swale or a series of y-inlets to the proposed system. If any construction easements will be needed for construction of the box culvert, these need to be obtained from the property owner prior to starting construction. Provide a copy to the City. There are various other minor comments throughout the plan~. When all comments have been addressed, please return these marked plans and two sets of revised plans to the City for review. If you have any questions, please contact me at (972) 304-7019. Sincerely, Kent M. Collins, E.I.T. Graduate Engineer