Park West CC(02)-LR 961220 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORTED TO: REPORT OF FIELD DENSITY TESTS Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commerical Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian E. Grant REPORT NO. 78 REPORT DATE: 12-20-96 REG PROJECT NO. 2753.2 TECHNICIAN: B. Lucas T. Belew CONTRACTOR: Bob Moore Construction, Inc. I 1 D-698 Dark gray clay 20.8 92.3 2 D-698 Yellowish-brown clayey sand 14.7 111.4 3 D-698 Reddish-brown clayey sand 14.1 114.2 4 D-698 Light brown clayey sand 13.1 113.7 5 D-698 Dark gray & brown clay 26.4 94.4 228 12-05-96 2'S, 60'E(1) 2.0 88.7 26.8 1 96.1 229 2'S,160'E(1) 2.0 88.5 26.6 1 95.9 230 3'S,210'E(1) 1.0 110.7 14.0 3 97.0 231 2'S,300'E(1) 1.0 111.4 13.5 3 97.5 232 2'S,360'E(1 ) 0.0 112.2 14.3 3 98.2 233 12-11-96 400'S, 1'E(2) 1.5 88.3 23.8 1 95.7 234 540'S, 2'E(2) 0.0 108.0 11.1 4 95.0 235 600'S, 2'E(2) 0.0 108.2 11.1 4 95.2 236 720'$, 2'E(2) 0.0 111.3 11.2 4 97.9 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 237 12-11-96 750'S, 2'E(1) 0.0 111.6 11.2 4 98.2 238 35'S,320'W(1 ) 0.0 83.6 36.6 5 88.6a 239 40'S, 50'W(2) 0.0 80.4 40.5 5 85.2b 240 12-12-96 35',320'W(1) 0.0 90.0 30.6 5 98.5A 241 40'S, 50'W(2) 0.0 93.0 28.4 5 98.5B 242 34'S,114'W(2) 0.0 92.5 30.8 5 97.9 243 10'S, 78'E(2) 0.0 92.0 30.4 5 97.4 244 240'S, 2'E(1) 0.0 109.0 13.7 4 95.8 245 200'S, 2'E(1) 0.0 91.2 27.1 5 96.6 246 150'S, 2'E(1) 0.0 110.7 13.7 4 97.4 247 120'S, 2'E(1) 3.0 90.0 30.0 5 95.3 248 70'S, 2'E(1) 2.0 93.0 30.6 5 98.5 Comments: Where tested, materials were in compliance with project specifications, unless noted otherwise. Failing test noted in lower case letter, passing retest noted in corresponding upper case letter. Footnotes: (1) Measurements referenced from N.W. building corner. (2) Measurements referenced from $.E. building corner. Distribution: (1) Insignia Commerical Group, Inc./ Mr. Brian E. Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) Ten Eyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of CoppelI-Building Inspections/ ~)~r. Lee Stone (,I,)' City of Coppell/Mr. Larry Davis (1) Ennis Steel/Mr. Rob Jones Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronaldo F. Reed, P.E. RFR/msm INSPECTION SERVICE 4305 Glenwood Ct. Graubury, TX 76049 (817) 246-8096 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: Park West Center I Coppell, TX Client~ Reed Engineering Group 2424 Stutz, Suite 400 Dallas, TX 75235 REPORT OF INSPECTION Drawings utilized: Structural Prints Report No: 6204-6 Attention: Keith Atkins Date of Service: 12-20-96 Page I of 1 Locations/item inspected: As noted Discrepancies/comments: 1) Joist to girder, grid lines 2, 3, & 4, between column lines A & K and B & J. Welds comply. 2) Joist to support angle along grid line 1: Welds comply. 3) Joist girder to panel pocket along column lines A & B, between grid lines 2 & 4: Welds comply. 4) Joist girder to column cap: Welds comply. These connections are on grid lines 2, 3, & 4, between column lines B & J, and C & I. Note: The two (2) 2,,x2,,x1/4"x1'-6" angles on each side of joist girder are incomplete as of this inspection. Reinspection of report dated 12-16-96 and 12-17-96 Metal roof deck, grid line 8 to 15, column line F to J. Reinspection revealed non-compliant to requirements for missing screws and fasteners not installed. This was the second (2nd) reinspection in the area of 8 to 15, F to H. We will perform our next reinspection when notified. Larry G. Peel CWI# 89120661 Technician ~ntract Inspect Service