Park West CC(02)-LR 961213GEOTECHNICAL AND G R I-'1 I I F~
ENVIRONMENTAL CONSULTANTS
REPORTED TO:
CONTRACTOR:
Insignia Commercial Group, Inc.
7557 Rambler Road, Suite 1300
Dallas, Texas 75231-7167
ATTN: Mr. Brian Grant
CONCRETE CYLINDER TEST REPORT
Parkwest Center - Building I
Airline Drive
Coppell, Texas
REPORT NO. 85
REG PROJECT NO. 2753.2
SAMPLE DATE: 12-13-96
TECHNICIAN: H. Johnson
Bob Moore Construction Inc.
Location of Sample
~i Paving - 40'N, 60 E of NW building corner 63/261 yds J
Design Information
j 1 Pioneer 9848 4000
Test Results
I 8419 01-10-97 28 122200 4330
8419 01-10-97 28 119800 4240 4290
Cylinder Data
J I 8419 5.0 50 55 5.1 8.25 AM N/A
Comments: Cylinders were cast due to visual inconsistency of this load.
Distribution:
(1) Insignia Commercial Group, Inc./
Mr. Brian Grant
(1) Hardy McCullah/MLM Architects/
Mr. Norman Coates
(1) TenEyck*Merritt*Barnett*Pitt/
Mr. Frank Merritt
(1) Bob Moore Construction, Inc./
Mr. Ed T. McGuire
(1) City of CoppelI-Building Inspections/
· ~.'Lee Stone
(!10' City of Coppell/Mr. Larry Davis
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/cdl
2424 STUTZ DR. · SUITE400 · DALLAS, TX 75235 · TEL[214] 350 5600 · FAX[214] 350 0019
GEOTECHNICAL AND J~ F~J I'-1 I J F:~
ENVlRONHENTAL CONSULTANTS
REPORTED TO:
CONCRETE CYLINDER TEST REPORT
Parkwest Center - Building I
Airline Drive
Coppell, Texas
Insignia Commercial Group, Inc.
7557 Rambler Road, Suite 1300
Dallas, Texas 75231-7167
ATTN: Mr. Brian Grant
REPORT NO. 82
REG PROJECT NO. 2753.2
SAMPLE DATE: 12-13-96
TECHNICIAN: H. Johnson
CONTRACTOR: Bob Moore Construction Inc.
Location of Sample
1 Paving - 95'N, 60'E of NW building comer 20/261 yds
2 Paving - 65'N, 90'W of NW building corner 99/261 yds
3 Paving - 45'N, 90'W of NW building corner 162/261 yds
4 Piers - screen wall, west side 234/261 yds
Design Information
1 Pioneer 9848 4000
2 Pioneer 9848 4000
3 Pioneer 9848 4000
4 Pioneer 9848 4000
Test Results
I 8373 12-20-96 7 78000 2760
8373 01-10-97 28 114400 4050
8373 01-10-97 28 113800 4030 4040
2
8374 12-20-96 7 85500 3030
8374 01-10-97 28 117000 4140
8374 01-10-97 28 116800 4130
4140
8375 12-20-96 7 97900 3460
8375 01-10-97 28 120900 4280
8375 01-10-97 28 121400 4300
4240
4
8376 12-20-96 7 95600 3380
8376 01-10-97 28 124800 4420
8376 01-10-97 28 121700 4310
4370
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 - TEL [214] 350 5600 · FAX [214] 350 0019'
Cylinder Data
1 8373 5.00 50 55 5.0 08:00 AM 507222
2 8374 5.00 50 56 5.0 08:40 AM 507242
3 8375 5.00 53 62 5.2 10:15 AM 507255
4 8376 4.50 57 62 5.0 10:50 AM 507263
Distribution:
(1) Insignia Commercial Group, Inc./
Mr. Brian Grant
(1) Hardy McCullah/MLM Architects/
Mr. Norman Coates
(1) TenEyck*Merritt*Barnett*Pitt/
Mr. Frank Merritt
(1) Bob Moore Construction, Inc./
Mr. Ed T. McGuire
(1) City/of CoppelI-Building Inspections/
~. Lee Stone
~P/'City of Coppell/Mr. Larry Davis
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/cdl