Loading...
ST9604-CS 990525COPPELL, TEXAS 75019 RO, Box 478 Coppell, Texas 75019 972-462-0022 May 25, 1999 J. Tab Neblett, Asst. Vice President WHRL Real Estate Limited Partnership 600 Las Colinas Blvd., Suite 1900 Irving, TX 75039 RE: Fairway Drive Project # ST 96-04 Dear Mr. Neblett: This letter is written as a follow-up to the agreement approved by the City of Coppell on October 14, 1997 concerning a cost sharing on the traffic signal at Fairway Drive/Belt Line Road. At the time of the agreement, the estimated cost of a 'traffic signal was approximately $85,000. Included with this letter is a copy of our final pay estimate from the contractor with items pertaining to the traffic ~onal highlighted. The total cost to the City of Coppert for the traffic signal was $125,135.10. This includes the following: Items 18-23/Street markings Items 29-33/Conduits Items 34-41/Wiring Item 42/Opticon Item 43/Railroad interconnect wiring Item 44-45/Loop detector and hardware Item 46/Controller Items 47-49/Foundations Items 50-~2/Signal poles and Mask arms Items 53-55/Signal heads and backphtes Items 56-57/Pedestrian assemblies Items 58/Electric Service Items 59 & 60fPuH boxes Item 61/Display board Items 62-65/Traffic sign poles/foundations Items 66-69frraffic signs Item 70/Street name Total $2,759.80 20,306.90 14,230.40 2,800.00 214.50 7,911.50 24,000.00 6,392.00 14,200.00 10,920.00 2,000.00 7,500.00 2,800.00 760.00 1.600.00 $125,135.10 It is my opinion that the cost of the traffic signal exceeded estimates became it was part of a street project and the traffic signal contractor was a subcontractor to the street paving contractor. We awarded a project in January 1999 for a very similar traffic signal along Denton Tap Road at a total cost of $97,300. That was a stand-alone project of which the low bidder was a contractor who speelali74~s only in the illstallation of ll'af~c sig!lals. To try to be as fair as possible and to stay somewhat dose to the estimated $85,000, I have reevaluated the bid items and am prepared to base your 1/3 cost share on a total value of $92,049.30. This nnmber is comprised of the following: Items 29-33/Condnits Items 34-41/Wiring Item 46/Controller Items 47-49/Foundations Items 50-52/Signal poles and mast arms Items 53-55/Signal heads and backplates Item 58/Electric service Total $20,306.90 14,230.40 24,000.00 6,392.00 14,200.00 10,920.00 2.000.00 $92,049.30 AH of these components would not constitute a completed traffic signal installation since it does not include items such as marking, loop detectors, traffic signage, etc. However, they do constitute the bulk of the items necessary for the construction of a traffic signal. Your cost share of the $92,049.30 would be $30,683.10. In order for the City to final out this project please remit a check in the amount of $30,683.10 in accordance with paragraph 2 of the Traffic Signali~,ation Cost Sharing Agreement. I hope that you agree that my analySiS Of the COStiUg is fair, however, if you should have any questions please feel free to contact me at your convenience. Sincerely, Kenneth M. Griff'm, P.E. Director of Engineering and Public Works cc: Jim Witt, City Manager City of Coppell Project No: IContractor: Rebcon, Inc. 1868 W. Northwest Hwy Dallas, TX 75220 ST 9t-04; P.O.# 98-0003203-001 Pay Estimate No.: Project Name: Estimate Period: UNIT CONTRACT ITEM DESCRIPTION MEA, S QUANTITY I PREP ROW LS 1.0 2 UNCL STREET EXCAV CY 140.0 3 BORROW CY 2750.0 4 REM EXIST CONC PVMT SY 210.0 5 6" 650 FLEX (~ 7 DAY PVMT SY 520.0 6 6" CURB LF 273.0 7 CONC STREET HEADER LF 37.0 8 CONC RAILROAD HEADER LF 74.0 9 6" LIME STAB SUBGRADE SY 725.0 10 LIME (30#/SY) TON 11.0 11 4" 3000 PSI CONC SIDEWALK SF 830.0 12 UNI-DECOR PAVING STONE ON CONC SF 620.0 13 HOLLAND PAVING STONE ON CONC LF 34.0 14 MONO MEDIAN SY 21.0 15 6" TOPSOIL CY 375.0 16 HYDROMULCH SY 1750.0 17 SOLID SOD BUFFALO GRASS SY 140.0 18 4" LANE STRIPE WHITE · LF 72.0 19 8" LANE STRIPE YELLOW · LF 104.0 20 18" WIDE STOP LINE WHITE · LF 115.0 21 24' WIDE STOP LINE WHITE ?-~' · LF 36.0 22 ADV MARKER ARROW &ONLY · EA 1.0 23 ADV MARKER STRAIGHT &ARROW · EA 1.0 24 ADV MARKER R-X-R EA 2.0 25 MBGF WI TERM ANCH EA 2.0 26 PRE-CAST CONC RR CROSSING LF 63.0 27 RR TRACK WORK LS 1.0 28 EROSION CONTROL LS 1.0 29 1" PVC SCH 40 TRENCHED o LF 172.0 30 2" PVC SCH 40 TRENCHED · LF 3649.0 31 3" PVC SCH 40 TRENCHED · LF 387.0 32 3" PVC SCH 40 BORED , LF 204.0 33 4" PVC SCH 40 TRENCHED , LF 18.0 34 ELECT CONDTR #8 XHHW , LF 465.0 35 SOLID COPPER 12 CONDTR #18 AWG · LF 2809.0 36 SIGNAL CABLE 16 CONDTR #12 AWG , LF 526.0 37 NO 14 DETECTOR LOOP LEAD IN , LF 7725.0 38 SIGNAL CABLE 5 CONDTR #16 AWG o LF 468.0 39 SIGNAL CABLE 7 CONDTR #16 AWG e LF 234.0 40 3 CONDTR ~ POWER , LF 209.0 41 OPTICOM CABLE 3 CONDTR ~20 AWG , LF 673.0 42 3 M OPTICOM DETECTOR , EA 4.0 43 INTERCONNECT 2 CONDTR #14 AWG , LF 194.0 44 LOOP DET INSTALLATION * LF 1820.0 45 DIGITAL LOOP DET VEHICLE DET 2 CHAN * EA 7.0 46 a20A MULTISONIC 8 PHASE NEMA CONCTROU, ER WI CABINET · EA 1.0 47 FOUNDATION TY 30-B W/CASING , LF 13.0 48 FOUNDATION TY 36-A WI CASING · LF 45.0 49 CONTROLLER FOUNDATION e CY 2.0 50 SIGNAL POLE WI 30' MAST ARM , EA 1.0 51 SIGNAL POLE W/36' MAST ARM · EA 1.0 52 SIGNAL POLE WI 44' MAST ARM · EA 2.0 53 12' TRAFFIC SIGNAL HEAD · EA 50.0 54 TRAF SIG 3 SECT HEAD BACKPt. ATE · EA 10.0 55 TRAF SIG 5 SECT HEAD BACKPLATE · EA 4.0 5 & Final Revised Fairway Drive City of Coppell 12/01/98-1/31/99 QTY UNIT TO DATE PRICE 1 $32,000.00 0 $19.00 2213 $10.00 139 $10.00 548.4 $69.00 255 $2.00 0 $9.00 74 $15.00 667 $7.00 10 $98.00 954.8 $4.00 696 $9.00 0 $20.00 19.4 $90.00 375 $25.00 0 $3.00 0 $5.00 52 $2.00 102 $3.40 127 $7.00 65 $8.00 1 $500.00 1 $400.00 3 $500.00 2 $1,700.00 63 $300.00 1 $35,000.00 0 $5,000.00 346 $2.50 4065 $3.40 173 $5.30 262 $17.00 25 $10.00 471 $0.60 3020 $1.50 600 $4.00 7942 $0.60 493 $1.20 250 $1.70 280 $2.00 520 $1.30 4 $700.00 195 $1.10 1447 $4.50 7 $200.00 I $24,000.00 13 $84.00 45 $100.00 2 $400.00 1 $3,000.00 1 $3.200.00 2 $4,000.00 50 $200.00 10 $60.00 4 $80.00 RI Job # 9811 WORK COMP TO DATE $32,000.00" $0.00 --"' $22,130.00 """ $1,390.00 ~ $37,839.60 --- $510.00 $0.00 "" $1,110.00 ""' $4,669.00 $980.00 ~ $3,819.20 """"' $6,264.00 "" $0.00 -" $1,746.00"""' $9,375.00,"'_._. $o .oo $o.oo --' $1o4.oo $346.80 $889.00 ~' $520.00 $500.00 $400.00/' $1,500.00 ~" $3,400.00 $18,900.00 $35,000.00 $0.00 ""' $865.00 ""' $13,821.00 / $916.90 ' $250.00 ' $282.60 / $4,530.~0~_ $2,400.00 $4,765.20 / $591.60 $425.00/' $560.00v''' $676.00 ~' S2,800.00 $214.50" $6,511.50" $1,400.00 $24 ,000.00~'' $1,092.00" $4.500.00" $800.00 ~' $3,000.00 / $3,200.00~ $8,000.00 f' $10,000.00v''- $600.00~ $320.00/' 56 PRED SIG ASSEMBLEY 2 INDICATION - EA 57 PED PUSH BUTTON ,, EA 58 SERVICE METER INSTALLATION o EA 59 TY A GROUND PULL BOX - EA 60 TY C GROUND PULL BOX · EA 61 INTERSECTION DISPLAY BOARD · EA 62 TRAF SIGN W10-1 POLE & CONC FOUND ~ · EA 63 TRAF SIGN W3-3 POLE & CONC FOUND - EA 64 TRAF SIGN W10-2L POLE & CONC FOUND · EA 65 TRAF SIGN WIO-2R POLE & CONC FOUND · EA 66 TRAF SIGN R10-12 · EA 67 TRAF SIGN RIO-4bR o EA 68 TRAF SIGN RIO-4bL · EA 69 TRAF SIGN R3-SLR · EA 70 STREET NAME SIGNS ON MAST ARM · EA 71 BARREL MOUNTED BARRICADE LF 72 UPLOAD/DOWNLOAD DEVICE o EA 8.0 8 $600.00 8.0 8 $130.00 1.0 I $2,000.00 15.0 14 $500.00 1.0 I $500.00 1.0 I $900.00 4.0 5 $400.00 2.0 0 $400.00 1.0 I $400.00 1.0 1 $400.00 4.0 4 $100.00 4.0 4 $20.00 4.0 4 $20.00 1.0 I $200.00 4.0 4 $400.00 50.0 0 $20.00 1.0 I $5,000.00 0.0 0 $0.00 $200.00 $1,600.00 $0.00 $5,00O.O0 $0.00 f" Calendar'DaYs for Final Completion: 180 :ePPn~~~dM~G. rfffin P.E~~ire~r of Engineering Work Completed to Date: Less 0% Retainage: Less Previous Payments: Total Due This Estimate: Calendar Days Used To Date: Remarks: Date:'~ '2.~- ~ works Date: $310, 767.90" $0.00 $310,767.90 "**' $279,368.37 (.$_31,399.5t) / ~L~ oO" 6~q;L - ~,oo0 ' 500 ' ~oO' Z qO0 ' I boo - t2,5 rss /, y/ ~ ~oo ~,t see.go + ~'~" 500.00 +Z~ 13,821 .O0 282 60 + 4630.00 4~755.20 + ~1: 591 "~0 + 425 · SO + 56C-C0 +4 575 · CO + 4,5jj.20 +~ 5SC.SO +49 5,2:;:.:o+5[ '- ~zs.so + 55 5ZC.CO ~jC · CO +~ 5, :cc.:o ~ +1o