Loading...
Park West CC(02)-LR 961106GEOTECHNICAL AND J~j J~JJ r-I I I ~ ENVIRONHENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commercial Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian Grant REPORT NO. 67 REG PROJECT NO. 2753.2 SAMPLE DATE: 11-06-96 TECHNICIAN: H. Johnson CONTRACTOR: Bob Moore Construction Inc. Location of Sample ..... I ..... Paving -21~O'N, 50'W of SW building comer 40/130 yds 2 Paving - 200'N, 80'w of SW building comer 110/130 yds 3 Panel - #46 30/130 yds 4 Panel - #82 100/130 yds Design Information 1 Pioneer 9848 4000 2 Pioneer 9848 4000 3 Pioneer 9349 4000 4 Pioneer 9349 4000 Test Results 1 7835 11-13-96 7 78700 2790 7835 12-04-96 28 7835 12-04-96 28 2 7836 11-13-96 7 82900 2930 7836 12-04-96 28 7836 12-04-96 28 3 7837 11-09-96 3 85500 3030 7837 11-13-96 7 99300 3510 7837 12-04-96 28 7837 12-04-96 28 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 4 7838 11-09-96 3 83600 2960 7838 11-13-96 7 105700 3740 7838 12-04-96 28 7838 12-04-96 28 Cylinder Data 1 7835 5.00 73 76 5.2 07:50 AM 498925 2 7836 4.50 73 76' 5.0 10:20 AM 498942 3 7837 4.50 76 78 N/A 11:56 AM 498952 4 7838 4.50 78 81 N/a 01:40 PM 498959 Distribution: (1) Insignia Commercial Group, Inc./ Mr. Brian Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) TenEyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of CoppelI-Building Inspections/ ~t1~. Lee Stone (t~City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/cdl GEOTECHNICAI. AND ENVIRONMENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commercial Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian Grant REPORT NO. 67 REG PROJECT NO. 2753.2 SAMPLE DATE: 11-06-96 TECHNICIAN: H. Johnson CONTRACTOR: Bob Moore Construction Inc. Location of Sample I ........ 1 Paving - 260'N, 50 W of SW building corner 40/130 yds I 2 Paving - 200'N, 80'w of SW building corner 110/130 yds / 3 Panel - ¢f46 30/130 yds / 4 Panel - #82 100/130 yds Design Information 1 Pioneer 9848 4000 2 Pioneer 9848 4000 3 Pioneer 9349 4000 4 Pioneer 9349 4000 Test Results 1 7835 11-13-g6 7 78700 27g0 7835 12-04-96 28 94300 3340 7835 12-04-96 28 98300 3480 3410 2 7836 11-13-96 7 82900 2930 7836 12-04-96 28 110800 3920 7836 12-04-96 28 103200 3650 379O 7837 11-09-96 3 85500 3030 7837 11-13-96 7 99300 3510 7837 12-04-96 28 123700 4380 7837 12-04-96 28 120600 4270 433O 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 4 7838 11-09-96 3 83600 2960 7838 11-13-96 7 105700 3740 7838 12-04-96 28 123300 4360 7838 12-04-96 28 115900 4100 4230 Cylinder Data 1 7835 5.00 73 76 5.2 07:50 AM 498925 2 7836 4.50 73 76 5.0 10:20 AM 498942 3 7837 4.50 76 78 N/A 11:56 AM 498952 4 7838 4~50 78 81 N/a 01:40 PM 498959 Distribution: (1) Insignia Commercial Group, Inc./ Mr. Brian Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) TenEyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of Coppell-Building Inspections/ Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E, Atkins KENcdl 'i · III I II I I~ I · Iiii .