Loading...
Park West CC(02)-LR 960911 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORTED TO: CONTRACTOR: CONCRETE CYLINDER TEST REPORT Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commercial Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian Grant REPORT NO. 21 REG PROJECT NO. 2753.2 SAMPLE DATE: 09-11-96 TECHNICIAN: H. Johnson Bob Moore Construction Inc. Location of Sample I Floor slab - A.5-B and 16 & 17 20/580 yds 2 Floor slab - B-C and 17 & 18 90/570 yds 3 Floor slab - C-D and 16 & 17 170/570 yds 4 Floor slab - D-E and 16 & 17 250/570 yds 5 Floor slab- C-D and 17 & 18 330/570 yds 6 Floor slab - E-F and 17 & 18 410/570 yds 7 Floor slab - G-H and 17 & 18 520/570 yds Design Information I Pioneer 9349 4000 2 Pioneer 9349 4000 3 Pioneer 9349 4000 4 Pioneer 9349 4000 5 Pioneer 9349 4000 6 Pioneer 9349 4000 Test Results 1 3700 09-18-96 7 116200 4110 3700 10-09-96 28 147300 5210 3700 10-09-96 28 144800 5120 5170 3700 Hold 2 3701 09-18-96 7 108600 3840 3701 10-09-96 28 145100 5140 3701 10-09-96 28 150500 5330 5240 3701 Hold 3 3702 09-18-96 7 113400 4010 3702 10-09-96 28 146300 5180 3702 10-09-96 28 136500 4830 5010 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Test Results 4 3703 09-18-96 7 91100 3220 6 3703 10-09-96 28 138500 4900 3703 10-09-96 28 142800 5050 4980 3703 Hold 3704 09-18-96 7 91800 3250 3704 10-09-96 28 112400 3980 3704 10-09-96 28 119500 4230 4110 3704 Hold 3705 09-18-96 7 92800 3280 3705 10-09-96 28 122700 4340 3705 10-09-96 28 117900 4170 4260 3705 Hold 3706 09-18-96 7 86700 3070 3706 10-09-96 28 117800 4170 3706 10-09-96 28 117400 4160 4170 3706 Hold Cylinder Data 1 3700 4.00 68 74 N/A 04:10 AM 482778 2 3701 4.50 70 73 N/A 04:50 AM 482285 3 3702 4.00 73 73 N/A 05:35 AM 482293 4 3703 5.00 74 76 N/A 06:50 AM 482301 5 3704 5.00 76 80 N/A 09:00 AM 482316 6 3705 4.50 79 83 N/A 10:20 AM 482327 7 3706 5.00 84 86 N/A 12:00 PM 482341 Distribution: (1) Insignia Commercial Group, Inc./ Mr. Brian Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) TenEyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of CoppelI-Building Inspections/ Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KE.A/cdl GEOTECHNICA~ AND ENVIRONPIENTAL CONSULTANTS REPORTED TO: CONTRACTOR: CONCRETE CYLINDER TEST REPORT Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commercial Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian Grant REPORT NO. 21 REG PROJECT NO. 2753.2 SAMPLE DATE: 09-11-96 TECHNICIAN: H. Johnson Bob Moore Construction Inc. Location of Sample 1 Floor slab -A.5-B and 16 & 17 20/580 yds 2 Floor slab - B-C and 17 & 18 90/570 yds 3 Floor slab - C-D and 16 & 17 170/570 yds 4 Floor slab - D-E and 16 & 17 250/570 yds 5 Floor slab - C-D and 17 & 18 330/570 yds 6 Floor slab - E-F and 17 & 18 410/570 yds 7 Floor slab - G-H and 17 & 18 520/570 yds Design Information 1 Pioneer 9349 4000 2 Pioneer 9349 4000 3 Pioneer 9349 4000 4 Pioneer 9349 4000 5 Pioneer 9349 4000 6 Pioneer 9349 4000 Test Results 1 3700 09-18-96 7 116200 4110 3700 10-09-96 28 3700 10-09-96 28 3700 Hold 2 3701 09-18-96 7 108600 3840 3701 10-09-96 28 3701 10-09-96 28 3701 Hold 3 3702 09-18-96 7 113400 4010 3702 10-09-96 28 3702 10-09-96 28 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Test Results i.i,i.i.i~!i,i ,i. i.i~i.i.i.l.i.::.::.i.i.i. !~.i.i.i.i.i.i .i.i.i.i~.i.i.i.i.i .i.i.~.i~j~.i .i.i.i .i.i.i.li i iiiiiiiii~:: ?:ii:::: ?::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::: .::.i.:: .::I:: .i.::.i.::.::~~i i~!~iiiiiliiiiiiiiiiiiiiiiiii~ii!~iiiiiiiiiiiiiiiiii 4 3703 09-18-96 7 91100 3220 3703 10-09-96 28 3703 10-09-96 28 3703 Hold 5 3704 09-18-96 7 91800 3250 3704 10-09-96 28 3704 10-09-96 28 3704 Hold 6 3705 09-18-96 7 92800 3280 3705 10-09-96 28 3705 10-09-96 28 3705 Hold 7 3706 09-18-96 7 86700 3070 3706 10-09-96 28 3706 10-09-96 28 3706 Hold Cylinder Data 1 3700 4.00 68 74 N/A 04:10 AM 482778 2 3701 4.50 70 73 N/^ 04:50 AM 482285 3 3702 4.00 73 73 N/A 05:35 AM 482293 4 3703 5.00 74 76 N/A 06:50 AM 482301 5 3704 5.00 76 80 N/A 09:00 AM 482316 6 3705 4.50 79 83 N/A 10:20 AM 482327 7 3706 5.00 84 86 N/A 12:00 PM 482341 Distribution: (1) Insignia Commercial Group, Inc./ Mr. Brian Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) Ten Eyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of CoppelI-Building Inspections/ Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/cdl GEOTECHNICAL AND ~ R O LJ ~ ENVIRONPIENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commercial Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian Grant REPORT NO. 20 REG PROJECT NO. 2753.2 SAMPLE DATE: 09-11-96 TECHNICIAN: E. Yerian CONTRACTOR: Bob Moore Construction Inc. Location of Sample I 1 Piers - J.5-22.8, J.5-21.8 and J.5-21.2 10/20 yds I Design Information Test Results 1 3699 09-18-96 7 93000 3290 3699 10-09-96 28 3699 10-09-96 28 Cylinder Data I 1 3699 5.0 96 92 N/A 12:30 PM 482354 Distribution: (1) Insignia Commercial Group, Inc./ Mr. Brian Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) TenEyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of CoppelI-Building Inspections/ Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/cdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 - FAX [214] 350 0019 GEOTECHNICAL AND G F~ r'l I I ~ ENVIRONI'IENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Parkwest Center - Building I Airline Drive Coppell, Texas Insignia Commercial Group, Inc. 7557 Rambler Road, Suite 1300 Dallas, Texas 75231-7167 ATTN: Mr. Brian Grant REPORT NO. 2O REG PROJECT NO. 2753.2 SAMPLE DATE: 09-11-96 TECHNICIAN: E. Yerian CONTRACTOR: Bob Moore Construction Inc. Location of Sample " i ............... r~ ers: J15~2'2'.8, J.5-21.8 and ~Ji~:21.2 10/20 yds Design Information I 1 Pioneer 9349 3000 Test Results 1 3699 09-18-96 7 93000 3290 3699 10-09-96 28 120000 4250 3699 10-09-96 28 122000 4320 4290 Cylinder Data I ........ ;i 3'69~ 5.0 96 92 N/A 12:30 PM 482354 Distribution: (1) Insignia Commercial Group, Inc./ Mr. Brian Grant (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates (1) TenEyck*Merritt*Barnett*Pitt/ Mr. Frank Merritt (1) Bob Moore Construction, Inc./ Mr. Ed T. McGuire (1) City of CoppelI-Building Inspections/ Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KENcdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019