Loading...
Park West CC(02)-CS 970729The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 29, 1997 To Whom it May Concern: RE: Lot 1R and 2R, Block 2 Park West Commerce Center This letter is written as a supplement to the storm sewer easement currently being provided to the City of Coppell by Park West Commerce Center, LLC. Please be advised that with the execution of the aforementioned storm sewer easement the City of Coppell will allow construction to take place in the easement that consist of off-site storm drainage systems as shown on Sheet C-6.1 entitled "Plan and Profile Line ST-1 Park West Center II". This sheet was approved by the City of Coppell on July 24, 1997 and includes the off-site construction of a 72" RCP tied into an existing City of Coppell storm drainage system to facilitate drainage off of Lot iR and 2R, Block 2 Park West Commerce Center. Any questions concerning the usability of this easement both now and in the future should be directed to Ken Griffin, P.E., Assistant City Manager/City Engineer at (972)304-3679. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer file/kgriffin/pkwest.797