Park West CC(02)-CS 970721Mr.. Paul Douglass
BOB MOORE CONSTRUCTION
1110 North Watson
Arlington, Texas 76011
July 21, 1997
PK No.: 1628-97:068
Re:
PARK WEST CENTER-PHASE II
Airline ~ Belt Line
Coppell, Texas
Dear Mr. Douglass:
Transmitted herewith, via courier service delivery, please find enclosed the following
prints for your use:
No. Date Description
12 07/10/97
Off-Site Drainage Sheets
If the enclosures are not as noted above, please contact this office immediately.
Mr. Mike Martin, P.E., with the City of Coppell, has approved the Off-Site Drainage
plans as listed above. These 12 sets are required to be stamped "APPROVED" by
the City. These plans are sent to you for your submittal to the City. In addition to
these 12 sets, the City also requires a 4% Inspection Fee based on documented
construction costs. This submittal package is required in order for the City to
stamp them approved in order to start construction on the Off-Site Drainage.
Return one set of stamped "APPROVED" plans to the Architect listed below and
one to this office.
If you have any questions ~egarding the enclosed items, or need any additional
information, please call me at your convenience.
JRP/Inc
1628-84
Sincerely, . ~
Powell, P.E.
enc.