Loading...
Park West CC(02)-CS 970625June 25, 1997 PK No.: 1628-97.068 Mr. Kenneth Griffin CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019-4409 Re: PARK WEST CENTER PHASE II Coppell, Texas Dear Mr. Griffin: Pursuant to Mr. Mike Martin's request last Thursday, this letter is requesting release of the paving permit for the referenced project. Release of the paving permit is with the understanding that the offsite drainage has not yet been resolved. In regards to the status of the offsite drainage, it has been brought to my attention that Mr. Steve Sears, with Insignia, was contacted last Friday by the owner of the adjacent property and was promised a response soon. Any further design of the offsite storm drainage is on hold until we get direction of where to locate the proposed offsite drainage. As you are aware, an easement exists for the installation of the offsite storm drain. However, construction in the existing easement would result in significant disruption to the existing berm and landscaping. The new easement would reduce this impact. Please advise should you have any questions require further information. JRP/drm 1628-74 R. Powell, P.E. enc. CC: Mr. Mike Martin - City of Coppell Mr. Steve Sears - Insignia Mr. Scott St. Clair- Bob Moore Construction Company