Loading...
Park West CC(02)-CS 970520.' The City With A Beautifu Scott St. Clair Bob MooreConstruction, Inc. 1110 North Watson Road Arlington, TX 76011-3188 Parkwest Commerce Center, Lot IR & 2R, Block 2 (Paragon Group ID Development Fee Asses,.nnent P.O. Box 478 Coppell, Texas 75019 214-462-0022 May 20, 1997 Dear Mr St. Clair: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $38,672.21 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Ke~th M. Griff'm, P.E. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg lones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Date: Parkwest Commerce Center, LotlR & 2R, Block 2 (Paragon Group II) 5/20/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,850.00 $5,850.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,516.85 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $29,222.21 $29,222.21 (100% due prior to Council Approval) Street Light Fee Information not (100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $41,735.04 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $38,672.21 DEVELOPMENT FEE WORKSHEET PROJECT: Parkwest Commerce Center, LotlR & 2R, Block 2 (Paragon Group II) DATE: 5/20/97 ~ Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter{s): I - 2 inch = 8 ESU's 1 - 1 inch = 2.5 ESU's = ESU's I - 8 inch = 2.5 ESU's Total #: 13 ESU's @ ~450.00 ea. {100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. {Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter{s) @ Total #: 0 Additional Irrigation Meter{s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water meters) $57.75 $2,459.10 Water Meter Deposit Fee (Domestic): Total #: 1 Meter{s) @ $30.00 ea. {100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter{s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @ $450.00 ea. $5,850.00 $150.00 $195.98 $57.75 $0.00 $ 2,459.10 $30.00 $70.00 $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $29,222.21 Information not avaflabEatthistime Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Parkwest Commerce Center, Lot IR & 2R, Block 2 (Paragon Group I1) 5/20/97 ROADWAY IMPACT FEE: ;ervice Area * 10 ~ategory ** Industrial ~and Use ** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** General Li~:ht Industrial 367,575 367.575 1.~ $300 Roadway Impact Fee due -- (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $116,888.85 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 75 % Credit as per letter dated 6/5/96 from the City of Coppell to Dupey Management Corporation $87,666.64