Park West CC(02)-CS 970421he City With A Beautiful Future .
P.O. Box 478
Coppell, Texas 75019
214-462-0022
April 21, 1997
James Koch, P.E.
Pacheco Koch Engineers, Inc.
9401 LBJ Freeway, Suite 300
Dallas, Texas 75243
Parkwest Commerce Center (Paragon Group)
Final Acceptance
Dear Mr. Koch
A final inspection of paving and utilities for the referenced project has been confLrmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.