Loading...
Park West CC(1)-CS 891219COPPELL PUBLIC WORKS DATE: TO: FROM: RE: December 19, 1989 T ar yon B owman, P~/,~&~Z Coordinator Russell R. Doy~ity Engineer Park West Com~erce--'~/'~' Center Thoroughfare Revision Transmitted herewith is a comment letter from the City of Coppell's consultants on the West of Denton Tap Road Major Thoroughfare Plan Study. Gary Sieb has already received a copy of this from Shohre Daneshmand when it was received via the Fax. These comments must be distributed to the P & Z Commission and City Council when they hear the related cases. Additionally, the cost of Southwestern/Park West Parkway and related bridge should be determined early on. Please let me know if you desire any further information. Thank you. RRD/bb xc: Steve Goram, Director of Public Works Shohre Daneshmand, Civil Engineer REVISION. RRD Initial TO & Circulate off tX SGG V/ )~ FILE ,190-9261 U S. A December 18, _~39 l{r. R,.}.sseA!. R. Doyle,. City oL' Coppell P.O. Box 478 Coppel!, TX 75019 RE: Park West Co~:~merce Center Thoroughfare Revision Request t};A No. 3'311. 01. 01 Dear i,ir. At your request, t~' c-. have revic:wcd the request by Prentiss Properties 'Limited, Inc, to realign southwesterp Boulevard and combine it w .... t~ Gateg;ay Boulevard. Our concern this request on our West Side Thoroughfare Plan study which we plan to start in J'anuary 1990. ]it was with this in mind tha't we reviewed the request. Erom Prentiss. To support thai. l; req~est, PrentJ. ss retained DeShazo, Starek & Tang, inc, to provide an alternatives analysis for the realignment of Southwestern. This analysis, submitted Dece~er 14, 1989, compared four alternative align'ments including the alignment presented in your existing Thoroughfare Plan. DS&T concluded that alternative 2 would allow fsr the greatest development potential of the industrial si. Les and provide for the best movement of traffic through the area. From the standpoint of our pending study, we believe alternative 2 is an acceptable alignment in thl. s area and does not significantly detract from the intent of the existing Thoroughfare Plan aligm~ent. However;, aEter review DS&T's report, we have a few questions, namely: o What is the impact on the other major thoroughfares in this section of the City (Bethel Road, Belt Line Road, Denton Tap Road) ?; Pac].~. ]. ~,~,:' . who owns the next tract to the o How dc west, feel about alternative 2?; o Who will pay for %he construction of Southwestern o Are the. indi. ca;,~d impacts 'to Airline Road justified?;. and, o Where are aA]. of the 10,600-plus trips that will. be generated, by Prentiss and Santa Fe Pacific? The graphics do not show all of these. City Page We wilJ. have uo prcbl, em i,f the City approves this request for the z .~..L :[qnmer,~t of' the above ,.,o ~ ,..a% ~.~> tern Doulevard. However ~ q~]estio]]s should be adduessed prior to approval. We do believe that the f~i]a! aiz.inS[ of this thoroughfare should be based on the resu].:::s of o~]r s~.~.dy~ ~ince this information will be the latest and most If yo~ have any further questions, plaase call. Sincerely, INC. I<RM/k ~: m