Park West CC(1)-CS 900315 (2)CASE:
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
PARK WEST COMMERCE CENTER ADDITION- FINAL PLAT
P & Z HEARING DATE: March 15, 1990
C. C. HEARING DATE: April 10, 1990
LOCATION:
Southwest corner of Beltline Road and Southwestern
Boulevard.
REQUEST:
Approval of a final plat with conditions, along with a
variance to omit sidewalks throughout the development
except along Beltline Road.
SIZE OF AREA: 328 acres
APPLICANT:
Prentiss/Copley Investments Group
1509 LBJ Freeway
Dallas, Texas 75234
HISTORY:
A preliminary plat for Park West was approved by the City
Council on January 9, 1990.
TRANSPORTATION:
Subject site is located adjacent to existing six-lane
divided Beltline Road. Southwestern Boulevard was recently
declared the approximate location for a re-routed six-lane
thoroughfare which would ali~n with the existing
thoroughfare plan west of Freeport Parkway. Thoroughfare
Plan R.O.W. shows 110 feet.
ANALYSIS:
Please see attached "Thoroughfare Amendment", page 2,
Reason Behind Request, which addresses this plat.
ALTERNATIVES:
1) Approve the final plat with variances as requested.
2) Approve the final plat without variances.
3) Deny the final plat.
ATTACHMENTS:
PWESTSTF
1) Final Plat (6 sheets)
ITEM
DATE
TO:
VIA:
FROM
RE:
COPP~LL pUBLIC WORKS
~MORANDUM
March 14, 1990
Gary Sieb, Director of Planning and~unity
_¥~/I
Steve Goram,~ector of Public Wor~/I
Russell Doyl~ity Engineer
Park West Commerce Center, Final Plat
(Planning & Zoning Meeting Date: March 15,
Services
1990)
Public Works staff
following comments:
has reviewed the above referenced plans and we have the
The final construction plans that we have received for review continue to
be incomplete. However, we have continued working faithfully with Mr.
Davis, the Project Manager, and have reviewed and responded to him on
incremental sections of design plans he has made available to us. You have
been provided with previous copies of Engineering DRC checklist comments
and letters.
We are providing another marked up plan to Mr. Davis including our
comments, along with a letter regarding the Floodplain Management Ordinance
and Compliance with it. We will provide you with a copy of said letter.
Storm sewer plans and profiles have not been submitted as of this date.
Floodplain Hydraulic Study has not been submitted as of this date (see
attached {this is of special concern} letter from FEM. A on property dated
August 18, 1987).
As per Richard Diane, codes, covenants and restrictions are not acceptable
because they do not show the City has ability to access for common area.
Sidewalks are required as per the Subdivision Ordinance, Public Works staff
doe~ not favor the sidewalk variance. If the applicant is requesting a
variance, it must be by letter of request and not just a note on the plat,
etc. We are responding to messers Davis, Pritchett, and Tucker on this
matter.
we still have concerns about the sanitary se~er out-fall. As per attached
letter from Mr. Davis, dated March 2, 1990, the Developer does not intend
tO participate in any offsite sanitary sewer improvement. The 12" sewer
is almost at capacity now and a full development of a 24" or larger pipe
will be required.
A minimum of 20 feet utility easements are required.
As you had requested from Mr. Davis during the March 6, 1990, DRC meeting,
it is our understanding there will be a note on the final plat stating that
... "all applicable development fees must be paid as each lot develops...".
10.
The street name of Southwestern Drive within this property and the one used
for the extension of said street to the west are inconsistent. Regardless
of the name used, we recommend that the street name be consistent
throughout. The street name should be a decision item and Police and Fire
should give recommendations.
11.
Attached, please find a copy of Engineering Division coments provided
during the February 27, 1990 and reused as our present con~ents as of
today.
12.
We have no objection to this plat and recomend approval with the condition
that final construction plans be approved within 90 days of approval of
final plat by the City Council. No construction shall occu~~
approved construction plans. No construction will take place~_~adequate
ingress and egress and any improvement be constructed to insure~fhe health,
safety and welfare of the public.
As noted above, there are a myriad of items that have not been addressed at this
time and remain as our comment on this project. As mentioned above, we will
continue to work with the applicant. Depending upon the Planning and Zoning
Commissioner's determination on this plat, we would recommend that any approval
and recommendations to the City Council by the P & Z Commission contain a clear
conditional or subject to statement based on the completion of the construction
drawings including the Floodplain Development Permit.
If you have any questions, please let us know.
SGG/RRD/MSD/bb
xc: Don Davis, Consulting Engineers
Mike Tucker, Prentiss Properties
PARKWEST.MSD
March 14, 1990
Mr. Alan D. Ratliff
City Manager
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Re: Park West Commerce Center
Dear Alan:
Pursuant to my letter to Gary Seib dated March 8, 1990, and our
subsequent telephone conversation, I have reviewed the design
schedule for Southwestern Boulevard with our engineer, Don
Davis. The construction documents will be completed and
submitted for City approval not later than July 16, 1990.
Yours truly,
Michael R. Tucker
Vice President
MRT / pg
xc:
Paisley Boney
Don Davis
Gary Seib
I~l.tl.7,,ll,~ I~I.t~II'EH'III-:N J.l~,11l'l.:l). IN(: I.~llEl I,IU J"l.tl.:F2,%¥~ I).~,I.I..'~,.TI-:\',,N?::,'~:I.I· '21.1 t.l,~.l.3IliIO
March 15, 1990
Honorable Mark Wolfe and City Council
City of Coppell
255 Parkway
Coppell, Texas 75019
Re: Park West Commerce Center
Dear Mayor Wolfe and City Council:
Prentiss Properties ("Prentiss") has submitted an application
for approval of a final plat for a 328 acre development known as
the Park' West Commerce Center. Earlier this year we obtained
approval of the preliminary plat and filed the final plat for
review and approval by the City.
During the review of the final plat we were informed that the
City's normal platting procedure would require that all of the
streets and utilities for the entire 328 acre industrial park be
installed immediately after the final plat is approved. While
this approach is workable for a residential subdivision in which
lots are identified on the plat and sold to developers, it is
not workable for a large scale commercial development in which
lots have not yet been defined and which will take 5 to 10 years
to fully develop.
We were advised that a way to avoid installing more
infrastructure than is needed for our initial building site is
to simply plat one site at a time. In this approach the City
would have construction plans for only the infrastructure
required to support the site being platted. We would also
furnish some conceptual utility masterplan information so that
the City Staff could be reasonably certain that the plans they
are reviewing would work within the overall context of the park.
We do not believe that this "piecemeal" approach is desirable
for either the City or us. We want the City to have a complete
set of plans for the entire park and we want to resolve all
issues relative to the park, including street alignments with a
plat on the entire 328 acres.
I)I,~F.'VI'I?~ I~'Ii()I,F:IrI'IF::4 I.l%,lrl't-.iJ. I',,(: 134i9 I.i~J I"H~-:~.:,.~.&', I)4,1.[A~,. Tl.:\,x~ 7323
We believe that a third option to plat approval exists. I would
note that this is the approach used by many cities and which we
have used in Farmers Branch and Irving with similar large scale
commercial developments. This approach allows us to complete
the construction documents for the entire park and submit them
to the City for approval. The City is thus assured that a
coordinated infrastructure plan exists for the park.
Each time we develop a new site we are required to replat a
section of the park in order to establish a legal building lot.
At the time of replat we would identify the portion of the
overall site infrastructure that is necessary to be constructed
for the new development site. City agreement on how much
infrastructure is needed would be necessary for plat approval.
This "phased construction" approach is vastly superior to the
"piecemeal" approach to plattin%. The specifics of this
approach are detailed below:
Construction Plans: Construction plans for the
infrastructure of the entire 328 acre development will be
provided within ninety (90) days of approval of the final
plat by City Council. Providing drawings for the entire
development assures the City that the infrastructure will
be constructed in accordance with a master plan.
Construction of Infrastructure: Utilities and roadways
will be constructed when needed to support development of
a new lot. The City has the assurance that such
improvements will be provided by being afforded three
subsequent approval processes prior to occupancy of each
building. First, in order to obtain a building permit, a
building site must be established in accordance with a
plat. Second, prior to construction, the builder must
obtain a building permit. Third, before the structure is
occupied, a certificate of occupancy must be obtained.
During the replatting phase, the infrastructure needs will
be assessed. Obtaining a building permit will trigger the
construction of any additional infrastructure necessary.
Finally, the additional infrastructure will need to be
fully installed prior to the certificate of occupancy
unless otherwise approved by the City Engineer.
Construction Permit Fees: The City currently requires
that 1/2 of the inspection fees for infrastructure
construction be paid at the time of plat approval. This
presupposes that the infrastructure work will proceed and
require inspection. We are proposing to pay the
inspection fees for the portion of infrastructure that
will be built at the time of each replat.
Southwestern Drive: Our traffic engineer has represented
that Southwestern Drive currently handles approximately
2,000 trips per day and that the development of our
property along Southwestern Drive will only generate 4,000
trips per day. Our traffic generation does not warrant an
improvement beyond two lanes. We have however, agreed to
construct a four lane divided thoroughfare to accommodate
the City's traffic. (We have dedicated right-of-way for
an ultimate six lane street in accordance with the City
Thoroughfare Plan.) According to the engineer, the State
Department of Public Highways and Transportation does not
require consideration of a four lane roadway until trips
exceed 8,000 trips per day. In order to justify the
expenditure of our money for oversizing Southwestern
Drive, we propose to construct Southwestern Drive at such
time that traffic on Southwestern Drive exceeds 8,000
trips per day as agreed by the City Engineer and Prentiss'
engineer. Such a schedule will avoid the unnecessary
expenditure of funds without the nexus required between
the development of property fronting on the roadway and
the need for improvements.
Prentiss concurs that it will be responsible for infrastructure
necessary to service its development. We are prepared to fully
live up to our obligations concerning these improvements.
However, at this time we are asking the City to provide a
reasonable schedule for the construction of improvements. Such
a schedule will enable us to develop in the City of Coppell a
successful industrial development associated with the Prentiss
name. We realize that we could have avoided the infrastructure
requirements now by bringing forward small plats on a
"piecemeal" basis. But this is not the Prentiss method of
development nor is it the proper means of development for
Coppell. We have provided a means of master planning a large
industrial tract in the City with a reasonable development
schedule that enables the flexibility to market the property and
to adjust to market demands while assuring that the development
meets the City construction standards.
We respectfully request
infrastructure construction
letter.
approval of the final plat and
phasing program as outlined in this
Very truly yours,
Michael R. Tucker
Vice President
xc:
Gary Sieb
Kirk R. Williams, P.C.
William S. Dahlstrom, Esq.
Paisley Boney
Minutes of March 15, 1990
Planning & Zoning Commission
Page 3
Item
Following discussion Commissioner Redford moved to approve Case
#ZC-524. Commissioner Gross seconded the motion; motion carried
(6-0) with Chairman Munsch and Commissioners Green, Gross,
Redford, Scott and Tunnell voting in favor of the motion.
PLATTING
7:
Consider approval of a final plat for Meadows Addition, Section
6, Phase 2, located at the southeast corner of Parkway Boulevard
and Samuel Boulevard, at the request of Meadowglen Properties.
P&Z Coordinator Taryon Bowman introduced the item to the
Commission. Ms. Bowman siated this plat is actually Phase 2 of
the Meadows Addition, or Case #PD-105. If approved, this plat
will allow the construction of thirteen single-family structures
on 2.68 acres. She further stated that all DRC comments have
been addressed; therefore, staff has no objections to the plat.
Mr. Glen Hinckley was present to represent this item before the
Commission. He stated that all utilities are already in place,
and that this property should have been included with the final
plat with D.R. Horton's project directly adjacent to this
property. Mr. Hinckley stated that it was due to an oversight
that this property was not included.
Following discussion Commissioner Tunnell moved to approve the
final plat for the Meadows Addition, Section 6, Phase 2.
Commissioner Scott seconded the motion; motion carried (6-0)
with Chairman Munsch and Commissioners Green, Gross, Redford,
Scott and Tunnell voting in favor of the motion.
Item
8:
Consider'approval of a final plat for Park West Commerce
Center Addition (formerly Gateway Park @ Coppell), located at
the southwest corner of Southwestern Drive and Beltline Road, at
the request of Prentis/Copley Properties.
Director of Planning Gary L. Sieb introduced the item to the
Commission. Mr. Sieb stated that this is a 328 acre tract, with
the preliminary plat already approved. He also stated that
staff would recommend approval of this final plat, however, he
would like to point out that the Public Works Department has
several concerns, as outlined in their memo dated March 14,
1990. Mr. Sieb also stated that the applicant has included a
letter dated March 15, 1990, which says that they do agree to
follow through with all their construction drawings and
everything will be submitted for City approval within ninety
(90) days of this plat going to City Council.
Minutes of March 15, 1990
Planning & Zoning Commission
Page 4
/)RAFT
More specifically, Mr. Sieb mentioned that the letter dated
March 14, 1990, and signed by Mr. Michael Tucker, Vice
President of Prentis, stated that all construction drawings
would be complete and submitted for City approval no later than
July 16, 1990.
Mr. Sieb also stated that Public Works has taken the stand that
sidewalks do need to be provided throughout this entire
project.
Mr. Mike Tucker of Prentiss Properties was present to represent
this item before the Commission. Mr. Tucker stated that they
feel they have worked out all of staff's concerns with their
letter dated March 15, 1990. He also stated that they had drawn
the plat to be consistent with the Thoroughfare Plan, which has
a six-lane right-of-way. He further stated that if Council
reduces the right-of-way to four lane divided, they would ask
Council to approve the plat with the condition that the
right-of-way be reduced to four-lane divided.
Following discussion Commissioner Gross moved to approve the
final plat for Park West Commerce Center with the condition that
they complete all the requirements outlined in the memo from the
Public Works Department, dated March 14, 1990, (ATTACHED) and
with the agreements stated in Mr. Tucker's letter of March 15,
1990 (ATTACHED). Commissioner Redford seconded the motion;
motion carried (6-0) with Chairman Munsch and Commissioners
Green, Gross, Redford, Scott and Tunnell voting in favor of the
motion.
Item 9: Consider approval of a preliminary plat for Gateway Business
Park Addition, located at the northwest corner of Freeport
Parkway and I.H. 635, at the request of Santa Fe Realty.
Director of Planning Gary L. Sieb introduced the item to the
Commission. Mr. Sieb stated that this subdivision plat also
relates to the thoroughfare amendment. Be also stated that this
is a 103.82 acre tract of land, and that staff recommends
approval of this preliminary plat.
Mr. Weldon Davis of Santa Fe Pacific was present to represent
this item before the Commission. Mr. Davis stated that he felt
the plat was basically a very simple request, and that they have
no problem agreeing with staff conditions. He further stated
that they will request Council to override the decision of the
Planning Commission to require a four-lane divided roadway, and
instead ask Council to approve an undivided street. Mr. Davis
stated that they feel the median would be a major detriment to
the industrial development.