Loading...
Park West CC(1)-CS 910128 COPPELL PUBLIC WORKS MEMORANDUM DATE: January 28, 1991 r'1 Fi~E coPr TO: /Steve Goram, Director of Public Works FROM: / Shohre Daneshmand, Acting City Engineer .~..~ RE: Park West Commerce Center (Tickler 1/18/91) Attached please find a copy of letter, drafted for your signature, in response to Mr. Bill Dahlstrom's letter dated December 13, 1990. (See attached). As you know, Staff has been reviewing referenced project and as per my discussion with Howard Pafford, we have no objection to the proposed water and sewer plans as requested by Prentiss. Please note that Mr. Dahlstrom has expressed his concerns, in several occasions, regarding the proposed drainage system in the vicinity of Southwestern Blvd. and Freeport Parkway. Bill has indicated that Prentiss does not intend to make such improvement, since this activity will mainly benefit Catellus Development Corporation, etc. As noted in the letter, item #6, such drainage improvement needs to be addressed by developer, as recommended in the City-Wide Storm Water Management Plan. As per Bill's request, I sent him a copy of related Halff's analysis. With the exception of some minor changes needed on the construction plans, all of our concerns have been addressed. Please let me know if you have any questions, otherwise this tickler is ended. End of Tickler. MSD/bd PARKWES7.MSD January 28, 1991 ~"\ p~R A i~R.A,F'd` Mr. William Dahlstrom Akin and Gump 4100 1st City Center Dallas, TX 75201 ~ _ -~ Re: Park West Commerce Center Dear Bill: This letter serves as a fo ow-up to your letter dated December 13, 1990, and your meeti with City Staff on December 11, 1990. Please be advised that- concur with you and have no objection to your responses regarding oversized waterline and sanitary sewer li Please note that, as per your discussion with Staff he following items are addressed: 1) A 12" waterline along Executive Drive, as delineated on the construction plan, is acceptable in lieu of replacing a 8" waterline along Beltline. 2)~ A new 8" waterline to replace the existing 8" waterline (W.L.) along Southwestern Blvd. is acceptable. The construction of 24" sanitary sewer line is included in the City's Capital Improvement Program, and therefore, Prentiss is not required to construct said sanitary sewer lines at this time. 4~ /Based on the newly proposed sanitary sewer plan shown ~/ on your construction plans, the existing 10" sanitary sewer line along Airline Drive is acceptable and need not be nlarged. .5) It is understanding that a.~ development along ~~ 1 / Wrangler Drive will necessitate t ro dw_ay ~~~/// improvements to Wrangler Drive ~ ~^ a > U l~S Letter to Mr. William Dahlstrom Akin and Gump January 28, 1991 Page 2 ~- „~ 6) The referenced draina~e problem, in the vicinity of Southwestern and Free ort Parkway, has been addressed in the City's draft Storm Water Management Plan. We recommend that affected property owners attempt to resolve this issue. The City Staff is available to act only as a convener, upon request, while the drainage problem needs to be addressed by affected developer(s). e ate that ~a~ec~ec~er~, 1991, regarding the reference~'is°s look forward to working with you on this development. have any questions, please don't hesitate to call. Sincerely, Steven G. Goram Director of Public Works SGG/MSD/bd cc: Mike Tucker, Prentiss M. Shohre Daneshmand, Acting City Engineer Howard Pafford, Water Superintendent Gabe Farve, Ginn, Inc. Don Davis, Don Davis Consulting Engineers ~ . -fie- Should you ~i ~~ PARKWTCC.SGG