Loading...
Parks Coppell FS-CS 881121 Federal Emergency Management Agency .,~.'," Washington, D.C. 20472 IN REPLY REFER TO: Mr. Jerry Parche, P.E. . , i! i'.. ' Jerry Parche Consulting Engineers ~.:. 6001 W. Interstate 20 /'f" NOV ~ Suite 209, LB 32 Arlington, Texas 76015 RE: Your October 6, 1988 letter regar ~in recl~r, ation project along Cottonwood Branch and Denton Creek. Dear Mr. Parch~: This is in response to the above-mentioned letter requesting that the Federal Emergency Management Agency (FEMA) determine the effects of a proposed flood plain modification in tb.e following community: City of Coppell, Texas F?.-~!A has initiated a reimbursement procedure to allow for the recovery of costs associated with t~he review of such requests, thereby reducing the expenses to the general taxpayer. Enclosed for your information is a copy of Part 72 of the National Flood Insurance Program regulations, by which this policy was implemented. We are currently reviewing your request pack.age to determine t~he appropriate processing procedure. When this initial review is completed, we will inform you of any fee or additional information that may be required to continue the processing of your submittal. Should you have any questions concerning this matter, please contact Matthew B. Miller of our Headquarters staff in Washington, D.C., at (202) 646-3461. Sincerely, Chief, Risk Studies Division Federal Insurance Administration ~nclosure cc: Mr. Russell R. Doyle, P.E., City Engineer for the City of Coppell. FEDERAL EMERGENCY MANAGEMENT AGENCY Revised as of October 1, 1986 Amendment No.1, June 30, 1987 National Flood Insurance Program and Related Regulations § 72.3 ,~ 72.1 Purpose nf part. The purpose of this part is to pro- vide administrative and cost recovery procedures for engineering review and processing associated with the issu- ance of Cond-itionai Letters of Map Amendment ,'conditional LOMAs) and Conditional Letters of Map Revision {conditional LOMRs). Final LOMAs and LOMRs granted to correct map deficiencies are not sulSject to this re- imbursement procedure. § 72.2 l)efinition.~. (a) Except as otherwise provided in this part, the definitions set forth in Part 59 of this subchapter are applica- ble to this part. (b) For the purpose of this part. a Conditional Letter of Map Amend- ment (conditional LOMA) is FEMA's comment on a proposed project to be located in and affecting only that por- tion of the area of special flood hazard outside the regulatory floodway and having no impact on the existing regu- latory floodway or effective base flood elevations. (c) For the purpose.of this part. a Conditional Letter of Map Revision (conditional LOMR) will be FEMA's comment on a proposed project that would affect the hydrologic and/or hydraulic characteristics of a flooding source and thus result in the modifica- tion of the existing regulatory flood- way or effective base flood elevations. § 72.3 Initial fee schedule. (a) For conditional Letters of Map PART ?2--PROCEDURE ANt) FEES Amendment, the initial fee shall be FOR OBTAINING CONDITIONAL paid by the requestor in the following APPROVAL OF MAP CHANGES amounts: ( 1 ) Single-lot ............................................. $125 Sec. (2) Multi-lot/subdivision ........................$175 72.1 Purpose of part. (b) For conditional Letters of Map 72.2 Definitions. Revision. the initial fee shall be paid '/2.3 Initial fee schedule, by the requestor in the following 72.4 Submittal/payment procedures and amounts: PEMA response. 72.5Exemptions. (I) New bridge or culvert (no chan- T2.6 Unfavorable response, nelization) .............................................. $350 72.7 Resubmittals. (2) Channel modifications only ............ $400 (3) Channel modification and new AtrrHORITY: 31 U.S.C. 9701:42 U.-%C. $,001 "~oridge or culvert ................................... $525 et seq.; Reorganization Plan No. 3 of 1978; (4) Levees. berms, or other structur- E.O. 12127. al measures ............................................ $675 SOURC£: 50 I:~ 36028. Sept. 4. 1985. unless (C) For projects involving combina- otherwise noted, tions of the above actions which are 313 'Fda- 154 O--8~ ! 1 § 72.4 44 CFR Ch. I (10-1-86 Edition) not separately identified, the initial ¢1) Notify the requestor within 30 fee shall be that charged for the most days as to the adequacy of the submit- expensive of the actions comprising tal, and the combination. (2) Within 30 days of receipt of ade- quate information, provide comment {}72.4 Submittal/payment procedures and to the requestor on the proposed FEMA response, project. (a) Initial fees shall be submitted (g) For conditional LOMR requests, with the request for FEMA review and FEMA shall: processing of conditional LOMAs and (1) Notify the requestor within 60 conditional LOM:Rs. days as to the adequacy of the submit- (b) Initial fees must be received by tal, and FEMA before the review can be initi- (2) Within 90 days of receipt of ado- ated for any conditional LOMA or con- quate information, provide comment ditional LOMR request, to the requestor on the proposed (c) Following completion of FEMA project. review for any conditional LOMA or § 72.5 Exemptions. conditional LOMR, the requestor will be billed at the prevailing private Federal, State, and local govern- sector labor rate (currently $25.00 per merits and their agencies shall be hour) for any actual costs exceeding exempt from fees for projects they the initial fee incurred during the sponsor if the requestor certifies that review, the particular project is for public (1) Requestors of conditional benefit and primarily intended for LOMAs will be notified of the antici- flood loss reduction to existing devel- pated total cost if the total cost of opment in identified flood hazard processing their request will exceed areas, as opposed to planned flood $500. plain development. (2) Requestors of conditional § 72.6 Unfavorable response. LOMRs will be notified of the antici- pated total cost if the total cost of A conditional LOMA or conditional processing their request will exceed LOMR may be denied or may contain specific comments, concerns, or condi- $1,500. tions regarding a proposed project or (3) In the event that processing costs design and its impacts on flood haz- exceed the limits defined in para- ards in a community. A requestor is graphs (c)(1) and (2) of this section, not entitled to any refund if the letter processing of the request will be sus- contains such comments, concerns, or pended pending FEMA receipt of writ- conditions, or if the letter is denied. A ten approval from the requestor to requestor is not entitled to any refund proceed, if the requestor is unable to obtain re- (d) The entity that applies to FEMA quired authorizations, permits, financ- through the local community for lng, etc., for which the letter was review will be billed for the cost of the sought. review. The local community incurs no financial obligation under the reim- §72.7 Resubmittals. bursement procedure set forth in this Any resubmittal of a request more part as a result of transmitting the than 90 days after FEMA notification submittal to FEMA. that a request ha~ been denied or after (e) Payment of both the initial fee a review has been terminated due to and final cost shall be by check or insufficient information or other rea- money order payable to the United sons will be treated as an original sub- States Treasury and must be received mission a_nd subject to all submittal/ by FEMA before the conditional payment procedures as described in LOMA or conditional LOMR will be § 72.4, including the initial fee. The issued, procedure of § ?2.4 including the ini- (f) For conditional LOMA requests, tial fee, will also apply if the project i~EMA shall: has been significantly altered in 314 Federal Emergency Management Agency design or scope other than that neces- sary to respond to previously issued comments, concerns, or conditions by I~EMA. 315