Parks Coppell FS-CS 881007 -J -- The City Wilh A Beautiful Future 214- 462- 0022
· :}
( .'
October 7, 1988
Mr. Jerry Parche
Parche Consulting Engineers
6001 W. Interstate 20
Suite #209, LB 32
Arlington, Texas 76016
RE: Floodplain Reclamation Study/Parkway Boulevard
Dear Mr. Parche:
I am in receipt of subject submittal, which we will hand carry to
F.E.M.A. on Monday. I am operating on the assumption that the design
submitted is in compliance with all current ordinances, rules and
regulations of the City of Coppell, including the Floodplain
Ordinance.
In the interest of expediting the project, I am passing your
submittal onto F.E.M.A., trusting that you have complied with all
requirements.
In the meantime, please submit three (3) sets of plans and drawings
to this office so that we can review the development that your
reclamation report represents. We will have the key members of the
DRC review those and, if necessary, will ask for a meeting to discuss
this matter. (It does appear that you omitted sealing your study).
As discussed in detail with you on Tuesday with the DRC, all
"grandfathered" documentation shall be submitted to me for
consideration of complying with that commitment. Your cooperation
and continued assistance in this matter is greatly appreciated.
Thank you.
:].~ ,/ t",.-. .,.~i ¥'
Jet,y Coos, lliqO [hirs-
h/City Engineer
RRD/lsg
xc: Alan Ratliff, City Manager Wayne Ginn, Ginn, Inc.
Steve Goram, Director of Public Works
Shohre Daneshmand, Civil Engineer
Taryon Bowman, P&Z Coordinator
Jay Chester, ABQ Development
003