Park West CC(6)-LR 970916 CONTRACT INSPECTION SERVICE
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 F~J((817) 246-5889
REPORT OF
STRUCTURAL STEEL ERECTION INSPECTION
Project: Park West Center II Report No: 7735-7
Coppell, TX Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 09-16-97
2424 Stutz, Suite 400
Dallas, TX 75235 Page 1 of 1
REPORT OF ~NSPECTION
Drawings utilized: Structural Prints/AWS D1.1-96
Locations/item inspected: As noted
Discrepancies/comments:
Metal roof deck, grid line 8 to 15, column line B to F:
1) Roof deck found non-complaint at numerous locations due to:
a) Loose nails
b) Undershot nails
c) Overshot nails
Hilti fastening system was used. Ail non-compliant areas were marked.
Structural steel, grid line 8 to 2, column line F to J:
1) Joist to girder: Welds comply.
2) Joist girder to column' cap: Welds comply.
3) Tie angle between top chords of girder at column: Welds comply.
Technician ./~ontract/~' Inspection Service