Loading...
Park West CC(6)-LR 970916 CONTRACT INSPECTION SERVICE 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 F~J((817) 246-5889 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: Park West Center II Report No: 7735-7 Coppell, TX Attention: Keith Atkins Client: Reed Engineering Group Date of Service: 09-16-97 2424 Stutz, Suite 400 Dallas, TX 75235 Page 1 of 1 REPORT OF ~NSPECTION Drawings utilized: Structural Prints/AWS D1.1-96 Locations/item inspected: As noted Discrepancies/comments: Metal roof deck, grid line 8 to 15, column line B to F: 1) Roof deck found non-complaint at numerous locations due to: a) Loose nails b) Undershot nails c) Overshot nails Hilti fastening system was used. Ail non-compliant areas were marked. Structural steel, grid line 8 to 2, column line F to J: 1) Joist to girder: Welds comply. 2) Joist girder to column' cap: Welds comply. 3) Tie angle between top chords of girder at column: Welds comply. Technician ./~ontract/~' Inspection Service This report is for the exclusive use of our client and sh&ll not be modified oF reproduced without written approval frc~ said client