Loading...
Park West CC(6)-LR 970822 CONTRACT INSPECTION SERVICE 4305 Olenwood Ct. Sranbury, TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: Park West Center II Report No: 7593-7 Coppell, TX Attention: Keith Atkins Client: Reed Engineering Group Date of Service 08-22-97 2424 Stutz, Suite 400 Dallas, TX 75235 Page 1 of 1 REPORT OF INSPECTION Drawings utilized: Structural Prints/AISC/AWS D1.1-96 Locations/item inspected: Grid Line 15 to 23, column line G.5 to J.6 As noted for items Discrepancies/comments: *1) Anchor bolts: Bolts comply except for one (1) loose at IxlS. *2) Joist to panel: Welds comply except for five (5) along grid lines 22 & 23. These 4'x4"xS/8"x0'-8" angles not welded all around as required by detail S5.1/03. The vertical sides of these angles not welded. 3) Joist to joist girder: Welds and bearing comply. 4) Joist girder to panel: Welds and bearing comply. 5) Joist girder to column: Welds and bearing comply. 6) 2"x2"xl/4"xl'-6" tie angle at top chord of girder: Welds comply. 7) Bridging installed. Reinspection of report dated 08-14-97 Item ~6, welder certifications: Certifications now submitted. * Open items Technician .C~tract Inspection Service