Park West CC(6)-LR 970822 CONTRACT INSPECTION SERVICE
4305 Olenwood Ct. Sranbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL STEEL ERECTION INSPECTION
Project: Park West Center II Report No: 7593-7
Coppell, TX Attention: Keith Atkins
Client: Reed Engineering Group Date of Service 08-22-97
2424 Stutz, Suite 400
Dallas, TX 75235 Page 1 of 1
REPORT OF INSPECTION
Drawings utilized: Structural Prints/AISC/AWS D1.1-96
Locations/item inspected: Grid Line 15 to 23, column line G.5 to J.6
As noted for items
Discrepancies/comments:
*1) Anchor bolts: Bolts comply except for one (1) loose at IxlS.
*2) Joist to panel: Welds comply except for five (5) along grid lines
22 & 23. These 4'x4"xS/8"x0'-8" angles not welded all around as
required by detail S5.1/03. The vertical sides of these angles not
welded.
3) Joist to joist girder: Welds and bearing comply.
4) Joist girder to panel: Welds and bearing comply.
5) Joist girder to column: Welds and bearing comply.
6) 2"x2"xl/4"xl'-6" tie angle at top chord of girder: Welds comply.
7) Bridging installed.
Reinspection of report dated 08-14-97
Item ~6, welder certifications: Certifications now submitted.
* Open items
Technician .C~tract Inspection Service