Loading...
Park West CC(8)-CS 941027DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Park West Commence Center, Replat of Blocks 5, 6 and 7 (lots IdES, located between Airline and Wrangler Ihives, west of Beltline Rd., at the regruest of Alber H. Halff Associates, Inc. DRC DATE: October 27, 1994 and November 3, 1994 CONTACT.• %n Griffin, P.E., Assistant City Manager/City Engineer (393-1016) COMMENT STATUS: ~# / FINAL Replat Comments: 1. Please comment as to a timetable when Wrangle Drive will be improved. If it is not to be constructed, then escrow should be paid. r'"` DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Pm~Tc Wist Commerce Center, Replat of Blocks 5, 6 and 7 (lots I&S, located between Airline and Wrangltr Olives, west of Beltkne Rd., at the nquest of Alber H. Halff Associates, Inc. DRC DATE: October 27, 1994 and November 3, 1994 CONTACT.• %n Gnffin, P.E., Assistant (sty Manager/(pity Enginetr (393-1016) COMMENT STATUS: / INITIAL ~#~ Replat Comments: 1. Please comment as to why Executive Drive has been offset from Lakeshore Drive. The minunum offset distance is 125 foot. 2. Please comment as to a timetable when Wrangle Drive will be improved. If it is not to be constructed, then escrow should be paid.