Loading...
ST9604-CS 980331 DESIGN PROGRESS REPORT FAIRWAY DRIVE CONSTRUCTION COPPELL, TEXAS MARCH 1998 1. Working on production of final plans and specifications for bidding based on comments received from the City and DART. 2. Additional field obsrvations made to confirm drainage patterns and condition of existing pavement. I :\PRO J\0 1227901 \INVXMARSUMM .DOC