Loading...
Park West CC(7)-LR 990429CONCRETE COMPRE 3IVE STRENGTH TES Date of Service: 03/31/1999 Report No.: 9909215 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Project: Attn: DavidGlass 3890 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/29/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5' 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 03/31/1999 BATCH TAYto: l:27pm TIME SAMPLED: 2:00pm BY: Shane Spinks WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 736 AIR CONTENT (%): 4.3 PLACEMENT LOCATION: Partly cloudy, windy, mild 65 F CONCRETE: 78 F TICKET NO: 227862 UNIT WEIGHT (pcf): N/A East approach near SE corner of building CYLINDER MARKED SET NO. MEASURED SLUMP (inches) REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 1 1 5.00 04/07/1999 1 2 5.00 04/07/1999 1 3 5.00 04/28/1999 I 4 5.00 04/28/1999 Sample location: Paving 170' S x 20' E of SE 7 110100 7 109670 Average 28 148980 28 153780 Average corner of building 3890 3880 3890 5270 5440 5360 Technician: Shane Spinks Report Distribution: (1) Prentiss Properties Limited, Inc. (l) Alliance Architects, Inc. ( 1 ) Halff Associates (1) Mullen & Powell Technistructures, I Started: 1 l:OOam (1) Butler Construction (1) City of Coppell (1) City of Coppell Finished: 4:00pm H~ E~lnc. Eugene Harbour Vice President 70 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 1