Loading...
Park West CC(7)-LR 990413CONCRETE COMPRE IVE STRENGTH TES. ". ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/31/1999 Report No.: 9909215 Client No.: 71765000 Project No.: 43-2170-98 Report Date 04/13/1999 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3890 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLA~rr: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5' 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 03/31/1999 BATCH TIME: 1:27pm ?IMESAMeLEO: 2:00pm BY: Shane Spinks WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 736 AIR CONTENT (%): 4.3 PLACEMENT LOCATION: Partly cloudy, windy, mild 65 F CONCRETE: 78 F TICKET NO: 227862 UNIT WEIGHT (pc0: N/A East approach near SE corner of building SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.00 04/07/1999 7 110100 1 2 5.00 04/07/1999 7 109670 Average 1 3 5.00 04/28/1999 28 I 4 5.00 04/28/1999 28 ACCUMULATIVE YARDS: 70 COMPRESSIVE STRENGTH (psi) 3890 3880 3890 FRACTURE TYPE Sample location: Paving 170' S x 20' E of SE corner of building Technician: Shane Spinks Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I Started: 1 l:00am (1) Butler Construction (l) City of Coppell (I) City of Coppell Finished: 4:00pm Vice President 01LL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1