Loading...
Park West CC(7)-LR 990330CONCRETE COMPRE oSIVE STRENGTH TES Date of Service: 01/29/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9903520 43-2170-98 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/30/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENaTH: 4000 psi @ 28 Days 3-5" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) ! I 5.25 1 2 5.25 1 3 5.25 1 4 5.25 ! 5 5.25 Sample location: 70' PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 01/29/1999 BATCH TIME: 8:53am TUvm SAMPLED: 10:10am ~V: Mario Villanueva WEATHER CONDITIONS: Cloudy and rain TEMPERATURE (F) - AIR 48 F CONCRETE: 64 F TRUCK NO: 736 TICKET NO: 192169 AIR CONTENT (%): N/A UNIT WEIGHT (pet): N/A PLACEMENT LOCATION: Building #1 restroom floor slab leaveouts REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 02/05/1999 7 107990 3820 02/05/1999 7 101770 3600 Average 3710 02/26/1999 28 127600 4510 02/26/1999 28 123140 4350 Average 4430 03/26/1999 56 140140 4960 North, 35' east of southwest corner of building #1 FRACTURE TYPE Technician: Mario Villanueva Report Distribution: (I) Prentiss Properties Limited, Inc. (!) Alliance Architects, Inc. (I) Haiff Associates (1) Mullen & Powell Technistructures, 1 Started: 9:30am Finished: 1 l:30am (1) Butler Construction (1) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1