Loading...
Park West CC(7)-LR 990329CONCRETE COMPRE o$IVE STRENGTH TES? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 02/23/1999 71765000 Report No.: 9905819 Project No.: 43-2170-98 Report Date 03/29/1999 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Quik Mix PLANT: 1563 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 0% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Column #2 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I 1 4.00 I 2 4.00 1 3 4.00 1 4 4.00 DATE TESTED 03/02/1999 03/02/1999 03/23/1999 03/23/1999 PROJECT DATA CONCRETE CLASS: 7 Sack-Pea Gravel PLACEMENT DATE: 02/23/1999 BATCH TAYto: 7:15am TnWE SAMPLED: 7:21am BY: Greg Dimock WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 41 F CONCRETE: 60 F TRUCK NO: 699 TICKET NO: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Colunms covered parking columns no grid lines and 30 columns poured (See attached sketch) REPORT OF TESTS ACCUMULATIVE YARDS: 7 MAXEMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 96690 3420 7 104370 3690 Average 3560 28 125740 4450 28 120710 4270 Average 4360 FRACTURE TYPE Technician: Greg Dimock Report Distribution: (1) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I Started: 6:00am Finished: 10:30am (1) Butler Construction (l) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 1 '-CONCRETE COMPREOSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/24/1999 Client No.: 71765000 Report No.: 9905925 Project No.: 43-2170-98 Report Date 03/29/1999' Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 BATCH TIME: 5:56am TIME SAMPLED: 7:02am BY: Jack Farris WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F) - AIR 39 F CONCRETE: 65 V TRUCK NO: 736 TICKET NO: 220116 Am CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving, Parking on west Side of Building SAMPLE LOCATION: See note below REPORT OF TESTS ACCUM-LILATIVE YARDS: 40 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.50 03/03/1999 7 87720 3100 1 2 5.50 03/03/1999 7 85400 3020 Average 3060 1 3 5.50 03/24/1999 28 115480 4080 1 4 5.50 03/24/1999 28 118310 4180 Average 4130 NOTE: Sample taken at truck from northeast corner of pour, 3' south and 8' west. See diagram. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 4 CONCRETE COMPREoSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/24/1999 Client No.: 71765000 Report No.: 9905925 Project No.: 43-2170-98 Report Date 03/29/1999 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3890 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 BATCH T~ME: 7:25am TIME SAMPLED: 8:36am BY: Jack Farris WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 846 Am CONTENT (%): 4.0 PLACEMENT LOCATION: Sunny 49 g CONCRETE: 68 TICKET NO: 220132 UNIT WEIGHT (pcf): N/A Paving, Parking on west Side of Building SAMPLE LOCATION: See note below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 5.75 03/03/1999 2 2 5.75 03/03/1999 2 3 5.75 03/24/1999 2 4 5.75 03/24/1999 REPORT OF TESTS NOTE: Sample taken at truck from northeast corner and 5' west. See diagram. MAXIMUM AGE LOAD (days) (lbs. force) ACCUMULATIVE YARDS: 160 COIVIPRESSIVE STRENGTH FRACTURE (psi) TYPE 7 86900 3070 7 90770 3210 Average 3140 28 120690 4270 28 127240 4500 Average 4390 of pour, 12' south This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 2 of 4 'CONCRETE COMPREoSIVE STRENGTH Date of Service: 02/24/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 9905925 43-2170-98 Lakeview Center Coppell, Texas Report Date 03/29/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 RATCH TIME: 8:30am TIME SAMPLED: 10:00am BY: Jack Fan-is WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 59 F CONCRETE: 70 F TRUCK NO: 730 TICKET NO.' 220145 AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving, Parking on west Side, next to Building SAMPLE LOCATION: See note below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 3 1 6.00 3 2 6.00 3 3 6.00 3 4 6.00 REPORT OF TESTS DATE AGE LOAD TESTED (days) (lbs. force) 03/03/1999 7 84640 03/03/1999 7 82820 Average 03/24/1999 28 123470 03/24/1999 28 126740 Average ACCUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH (psi) 2990 2930 2960 4370 4480 4430 NOTE: Sample taken at truck from northwest corner of pour, 12 yards south and 6' east. See diagram. FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 3 of 4 -CONCRETE COMPR oSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/24/1999 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: DavidGlass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9905925 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 03/29/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See note below PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 BATCI~ TreE: 10:20am TnVm SAMPLED: 1 l:48am BY: Jack Farris WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 72 F CONCRETE: 71 g TRUCK NO: 756 TICI~T NO: 220162 AIR CONTENT (%): 5.0 UNIT WEIGHT (pct'): N/A PLACEMENT LOCATION: Paving, Parking on west side of Building CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 4 1 5.75 03/03/1999 4 2 5.75 03/03/1999 4 3 5.75 03/24/1999 4 4 5.75 03/24/1999 NOTE: Sample taken at truck from southeast and 7 yards west. See diagram. Technician: Jack Farris Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I 7 93800 3320 7 85670 3030 Average 3180 28 119870 4240 28 121660 4300 Average 4270 corner of pour, 6' north Started: 5:00am (1) Butler Construction (1) City of Coppell (1) City of Coppell 310 FRACTURE TYPE Finished: l:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 4 of 4