Loading...
Park West CC(7)-LR 990324CONCRETE COMPREoSIVE STRENGTH Date of Service: 02/22/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9905668 43-2170-98 Lakeview Cen~r Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/24/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 39 F CONCRETE: 60 F SLUMP: 5.0" Max TRUCK NO: 852 TICKET NO: 219870 AIR: 3-5% AIR CONTENT (%): N/A uNIT WEIGHT (pet): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving- running east-west at north end of building. (see attached sketch) ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/22/1999 BATCH TIME: N/A TIME SAMPLED: 5:45am BY: Greg Dimock REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 9.50 03/01/1999 7 75180 2660 1 2 9.50 03/01/1999 7 84610 2990 Average 2830 1 3 9.50 03/22/1999 28 137160 4850 1 4 9.50 03/22/1999 28 141350 5000 Average 4930 Sample location: 180' W of E form and 15'S Ail sets sampled from truck. of N form. 01LL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 5 Report No.: 9905668 Note: At 6:00am the GC superintendent was not on job yet, technician informed concrete crew foreman the first sample slump test result was a 9.5" slump. The technician was told that corrective actions would be taken immediately. The Potter Const. crew did not dry up the concrete. Technician informed GC superintendent about matter and he had an immediate conversation with Potter foreman. The super told the foreman to correct problem. Butler Construction Company has two (2) superintendents on this job. The first super was unhappy with situation. Technician ran an additional slump test in front of him, the mixer driver and the second Butler super showed up as technician finished the test. The result was 5.5" slump. Technician explained to Potter foreman, that the slump on this load was already a .5" over specifications. Technician informed the Potter's foreman to speak with Butler's superintendent. The first Butler super is allowing a 6.0 slump maximum. The entire pour was wet, technician ran a 5 inches slump tests over 420 yards and all were over a 5 inch slump. 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TES? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/22/1999 Report No.: 9905668 Client No.: 71765000 Project No.: 43-2170-98 Report Date 03/24/1999 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: DavidGlass Coppell, Texas 3890 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:00am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 924 AIR CONTENT (%): 4.3 PLACEMENT LOCATION: See page i 9351 02/22/1999 BATCH TIME: 8:26am BY: Greg Dimock Partly cloudy 38 F CONCRETE: 61 F TICKET NO: 176302 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: 205' W of E form & 10' S of N form CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 7.25 03/01/1999 2 2 7.25 03/01/1999 2 3 7.25 03/22/1999 2 4 7.25 03/22/1999 REPORT OF TESTS AGE (days) ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 7 82730 2930 7 87580 3100 Average 3020 28 111830 3950 28 101230 3580 Average 3770 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 5 CONCRETE COMPREoSIVE STRENGTH Date of Service: 02/22/1999 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: DavidGlass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: Project No.: Project: 9905668 43-2170-98 Lakev~w Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/24/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/22/1999 BATCH TIME: 11:59am TIME SAMPLED: 12:30pm BY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 1888 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: See page I Cloudy 46 F CONCRETE: 60 F TICKETNO: 176329 UNIT WEIGHT(pc0: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 7.00 3 2 7.00 3 3 7.00 3 4 7.00 Sample location: 230'W of DATE TESTED 03/01/1999 03/01/1999 03/22/1999 03/22/1999 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (Ibs.~rce) (psi) 7 104490 3700 7 100480 3550 Average 3630 28 137010 4850 28 133150 4710 Average 4780 E form & 25' S from N form 10 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 5 CONCRETE COMPREoSIVE STRENGTH TES"*'.' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 02/22/1999 71765000 Report No.: 9905668 Project No.: 43-2170-98 Report Date 03/24/1999 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/22/1999 BATCH TnWE: 2:40pm TrMESAMPLED: 3:30pm BY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 1834 AIR CONTENT (%): 4.4 PLACEMENT LOCATION: See page i Cloudy 47 F CONCRETE: 60 TICKET NO: 176349 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 6.5O 4 2 6.50 4 3 6.50 4 4 6.50 Sample location: 60' E REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 03/01/1999 7 85300 03/01/1999 7 95290 Average 03/22/1999 28 125210 03/22/1999 28 128360 Average from west form & 5' south of north form. ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3020 3370 3200 4430 4540 4490 10 FRACTURE TYPE Technician: Greg Dimock Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (I) Halff Associates (1) Mullen & Powell Technistructures, Started: 3:30am Finished: 4:30pm (1) Butler Construction (l) City of Coppell (1) City of Coppell Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 5 of 5