Loading...
Park West CC(7)-LR 990315CONCRETE COMPREoSIVE STRENGTH TES Date of Service: 02/11/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9904727 43-2170-98 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/15/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTm 4000 psi @ 28 Days SLUMP: 3-5" AIR: 4-6% TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: SWC, Parking area, 25'NE NWC PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/11/1999 BATCI~ TIM~: 6:24am TIME SAMPLED: 8:40am BY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 65. F CONCRETE: 81. F TRUCK NO: 844 TICKET NO: 193860 AIR CONTENT (%): 4.1 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: SW covered parking between one wing and two wing CYLINDER MF_~SURED MARKED SLUMP SET NO. (inches) 1 1 5.00 1 2 5.00 I 3 5.00 1 4 5.00 Sample Location: SW 10 Gallons of water Technician: Mike Odom Report Distribution: (1) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (I) Halff Associates (1) Mullen & Powe[I Teclmistructures, i REPORT OF TESTS DATE TESTED 02/18/1999 02/18/1999 03/11/1999 03/11/1999 ACCUMULATIVE YARDS: 100 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 85550 3030 7 80280 2840 Average 2940 28 115830 4100 28 120330 4260 Average 4180 covered parking area, 225' added by Potter Concrete. Started: 8:00am (1) Butler Construction (l) City of Coppell ( 1 ) City of Coppell NE from WC wing one cut to '100". Finished: 10:00am Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 1