Loading...
Park West CC(7)-LR 990308CONCRETE COMPRCSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/24/1999 Report No.: 9905925 Client No.: 71765000 Project No.: 43-2170-98 Report Date 03/08/1999 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: DavidGlass Coppell, Texas 3890 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 BATCH TIME: 5:56am TIME SAMPLED: 7:02am BY: Jack Farris WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 736 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: Partly cloudy 39 F CONCRETE: 65 F TICKET NO: 220116 UNIT WEIGHT (pcf): N/A Paving, Parking on west Side of Building SAMPLE LOCATION: See note below REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.50 03/03/1999 7 87720 1 2 5.50 03/03/1999 7 85400 Average 1 3 5.50 03/24/1999 28 1 4 5.50 03/24/1999 28 ACCUMULATIVE YARDS: 40 COMPRESSIVE STRENGTH (psi) 3100 3020 3060 FRACTURE TYPE NOTE: Sample taken at truck from northeast corner of pour, 3' south and 8' west. See diagram. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ITel Page 1 of 4 CONCRETE COMPRE o$IVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/24/1999 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9905925 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 03/08/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See note below PROJECT DATA CONCRETE CLASS: 935 ! PLACEMENT DATE: 02/24/1999 BATCH T~ME: 7:25am TIME SAMPLED: 8:36am BY: Jack Farris WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 846 AIR CONTENT (%): 4.0 PLACEMENT LOCATION: Sunny 49 F CONCRETE: 68 TICKET NO: 220132 UNIT WEIGHT (pc0: N/A Paving, Parking on west Side of Building REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 I 5.75 03/03/1999 7 86900 2 2 5.75 03/03/1999 7 90770 Average 2 3 5.75 03/24/1999 28 2 4 5.75 03/24/1999 28 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3070 3210 3140 160 FRACTURE TYPE NOTE: Sample taken at truck from northeast corner of pour, 12' south and 5' west. See diagram. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 2 of 4 CONCRETE COMPREoSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/24/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9905925 43-2170-98 Lakeview Cen~r Coppell, Texas Report Date 03/08/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 4-6" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 BATCH TIME: 8:30am T~M~ SAMPLED: 10:00am BY: Jack Farris WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 730 Am CONTENT (%): 4.5 PLACEMENT LOCATION: Sunny 59 F CONCRETE: 70 TICKETNO: 220145 UNIT WEIGHT(~O: N/A Paving, Parking on west Side, next to Building SAMPLE LOCATION: See note below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 6.00 03/03/1999 7 84640 3 2 6.00 03/03/1999 7 82820 Average 3 3 6.00 03/24/1999 28 3 4 6.00 03/24/1999 28 ACCUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH (psi) 2990 2930 2960 FRACTURE TYPE NOTE: Sample taken at truck from northwest corner of pour, 12 yards south and 6' east. See diagram. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 3 of 4 CONCRETE COMPRE' 'oSIVE STRENGTH TES? Date of Service: 02/24/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9905925 43-2170-98 Lakeview Center Coppell, Texas ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/08/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See note below PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 02/24/1999 RATCI~ TIME: 10:20am TIME SAMPLED: 11:48am BY: Jack Farris WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 756 Am CONTENT (%): 5.0 PLACEMENT LOCATION: Sunny 72 g CONCRETE: 71 TICKET NO: 220162 uNrr WEIGHT (pc0: N/A Paving, Parking on west side of Building CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 1 5.75 03/03/1999 4 2 5.75 03/03/1999 REPORT OF TESTS ACCUMULATIVE YARDS: 310 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 93800 3320 7 85670 3030 Average 3180 4 3 5.75 03/24/1999 4 4 5.75 03/24/1999 28 FRACTURE TYPE NOTE: Sample taken at truck from southeast and 7 yards west. See diagram. Technician: Jack Farris Report Distribution: (1) Prentiss Properties Limited, inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I Started: 5:00am (1) Butler Construction (1) City of Coppell (1) City of Coppell corner of pour, 6' north Finished: l:00pm Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 4 of 4