Loading...
Park West CC(7)-LR 990301CONCRETE COMPREbSIVE STRENGTH TES:? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 01/29/1999 Report No.: 9903520 03/01/1999 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STREN(~TH: 4000 psi @ 28 Days N/A ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 01/29/1999 BATCH TreE: 8:53am TIM~ SAMPLED: 10:10am BY: Marlo Villanueva WEATHER CONDITIONS: Cloudy and rain TEMPERATURE (F) - AIR 48 g CONCRETE: 64 F TRUCK NO: 736 TICKET NO: 192169 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Building #1 restroom floor slab leaveouts SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.25 1 2 5.25 I 3 5.25 1 4 5.25 1 5 5.25 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 02/05/1999 7 107990 02/05/1999 7 101770 Average 02/26/1999 28 127600 02/26/1999 28 123140 Average 03/26/1999 56 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3820 3600 3710 4510 4350 4430 10 FRACTURE TYPE Sample location: 70' Technician: Marlo Villanueva Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (1) Halff Associates (1) Mullcn & Powe[I Teclmistructurcs, I North, 35' east of southwest corner of building #1 Started: 9:30am Finished: l l:30am (l) Butler Construction (1) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1