Loading...
Park West CC(7)-LR 990222CONCRETE COMPRESSIVE STRENGTH Date of Service: 02/11/1999 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9904727 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/22/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 4-6% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 935 1 PLACEMENT DATE: 02/11/1999 ~ATCH TIME: 6:24am TIME SAMPLED: 8:40am gY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 65. F CONCRETE: 81. F TRUCKNO: 844 TICg~T NO: 193860 AIR CONTENT (%): 4.1 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: SW covered parking between one wing and two wing SAMPLE LOCATION: SWC, Parking area, 25'NE NWC CYLINDER MARKED SET NO. REPORT OF TESTS ACCUMULATIVE YARDS: 100 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH (inches) TESTED (days) (lbs. force) (psi) 5.00 02/18/1999 7 85550 3030 5.00 02/18/1999 7 80280 2840 Average 2940 1 3 5.00 03/11/1999 28 1 4 5.00 03/11/1999 28 Sample Location: SW covered parking area, 225' NE from WC wing one cut to "100" 10 Gallons of water added by Potter Concrete. FRACTURE TYPE Technician: Mike Odom Report Distribution: (I) Prentiss Properties Limited, inc. (I) Alliance Architects, Inc. (1) Halff Associates (l) Mullen & Powell Technistructures, i Started: 8:00am Finished: 10:00am (1) Butler Construction (1) City of Coppell (I) City of Coppell IEngi_~ tc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of I