Loading...
Park West CC(7)-LR 990202· STATISTICAL ANALh SIS OF CONCRETE 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 02/02/1999 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9835048A Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 02/02/1999 Services: Review concrete compressive strengths for compliance with project specifications and ACI 318 Building Code. SPECIFICATION REQUIREMENTS: CONCRETE CLASS: 9351 PROJECT DATA 4000 psi ~ 28 Days REPORT OF TESTS NUMBER AIR CONCRETE COMPRESSIVE RUNNING REPORT OF SLUMP CONTENT TEMP STRENGTH 3 TEST AVG DATE NUMBER SET SAMPLES (in.) (%) (F) PSI PS! 11/11/1998 9830655 1 2 7.50 N/A 48 4090 11/11/1998 9830655 2 2 6.25 N/A 52 4670 12/17/1998 9833941 1 2 5.75 N/A 70 4100 4287 12/17/1998 9833941 2 2 5.50 N/A 66 4410 4393 12/17/1998 9833941 3 2 5.00 N/A 67 4810 4440 12/17/1998 9833941 4 2 5.50 N/A 72 4785 4668 12/30/1998 9835048 1 2 5.00 4.6 65 4402 12/30/1998 9835048 2 2 5.25 4.9 66 4575 4323 12/30/1998 9835048 3 2 5.00 4.7 69 4535 4240 Average of all sets of three consecutive strenghts equals or exceeds the project specifications. Average of 9 sets = 4400 PSI ~ 28 days Standard Deviation = 395 PSI Corrected Standard Deviation = N/A (less than 15 samples) Required Average Strength per ACI 318 (89) 5.3.2.2 = 5200 PSI Technician: Eugene Harbour Report Distribution: (I) Prentiss Properties Limited, Inc. (l) Alliance Architects, inc. (1) Halff Associates (1) Mullen & Powell Technistruetures, l (I) Butler Construction (1) City of Coppell (1) City of Coppell Il This report is exclusively for the use of'the client indicated above and shall not be ~eproduced except in full without the written approval of HBC Engineering, inc. Page I of 1