Loading...
Park West CC(7)-LR 990201CONCRETE COMPRESSIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/30/1998 Report No.: 9835048 Client No.: 71765000 Project No.: 43-2170-98 Report Date 02/01/1999 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3890 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 19 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3°5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:40am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1823 AIR CONTENT (%): 4.6 PLACEMENT LOCATION: Northeast comer parking lot 9351 12/30/1998 BATCH TIME: 8:20am BY: Mario Villanueva Clear 46 £ CONCRETE: 65 F TICKETNO: ·157884 UNIT WEIGHT (pcO: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. 1 1 I 2 I 3 1 4 Sample local MEASURED SLUMP DATE (inches) TESTED REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 5.00 01/06/1999 7 5.00 01/06/1999 7 5.00 01/27/1999 28 5.00 01/27/1999 28 5N' Northt ~9' ,~,gst of COMPLIES 'i,'hi~ ~'eport complies with , p~'oject plans/specifications based on our understanding ol the requirements. ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 66900 237O 72650 2570 Average 2470 100700 3560 103500 3660 Average 3610 northeast corner of~//building. 10 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of 3 -CONCRETE COMPRL SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/30/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9835048 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 02/01/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 19 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/30/19'98 BATCH TIME: 10:15am TIME SAMPLED: 11:45am BY: Marlo Villanueva WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 373 AIR CONTENT (%): 4.9 PLACEMENT LOCATION: See page I Clear 45 E CONCRETE: 66 TICm~T NO: 156582 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 110 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.25 01/06/1999 7 87200 3080 2 2 5.25 01/06/1999 7 88630 3130 Average 3110 2 3 5.25 01/27/1999 28 133710 4730 2 4 5.25 01/27/1999 28 124950 4420 Average 4580 Sample location: 100' South, 20' east of northeast corner of building. 01LL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/30/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9835048 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 02/01/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 19 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 3:25pm WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 852 AIR CONTENT (%): 4.7 PLACEMENT LOCATION: See page ! 9351 12/30/1998 BATCH TIME: 2:45pm BY: Marlo Villanueva Clear 58 V CONCRETE: 69 F TICm~T NO: 157931 UNITWEIGHT (pc0: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 I 5.00 3 2 5.00 3 3 5.00 3 4 5.00 Sample location: 200' South, Technician: Marlo Villanueva Report Distribution: (l) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. ( 1 ) Hal ff Associates (1) Mullen & Powell Technistructures, i DATE TESTED 01/06/1999 01/06/1999 01/27/1999 01/27/1999 70' east REPORT OF TESTS ACCUMULATIVE YARDS: 220 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (l~.~rce) (psi) TYPE 7 85320 3020 7 90460 3200 Average 3110 28 125990 4460 28 130320 4610 Average 4540 of northeast corner of building. Started: 8:30am (1) Butler Construction (1) City of Copp¢ll (1) City of Coppell Finished: 4:30pm ~ Eng~ Eugene HaPlYour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3