Loading...
Park West CC(7)-LR 990118.. CONCRETE COMPRi , 3SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/17/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9833941 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 01/18/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/17/1998 BATCH TIME: 4:20am TIME SAMPLED: 5:50am BY: Eddie Elrod WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 46 v CONCRETE: 70 F TRUCK NO: 802 TICm~T NO: 155320 AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: South parking lot building 1,395' west from east curb SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.75 12/24/1998 7 76700 2710 I 2 5.75 12/24/1998 7 78030 2760 Average 2740 I 3 5.75 01/14/1999 28 112450 3980 1 4 5.75 01/t4/1999 28 119440 4220 Average 4100 Sample location: 50' W of east curb & 20' N of S curb. 160 FRACTURE TYPE OILL This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 4 .CONCRETE COMPR J SIVE STRENGTH Date of Service: Client No.: Client: 12/17/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9833941 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 01/18/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5.0" Max N/A ASTM C~143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/17/1998 BATCH TIME: 6:45am TIME SAMPLEO: 7:50am BY: Eddie Elrod WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 846 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Clear 49 F CONCRETE: 66 F TICKET NO: 155332 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 180 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.50 12/24/1998 7 89460 3160 2 2 5.50 12/24/1998 7 90400 3200 Average 3180 2 3 5.50 01/14/1999 28 130120 4600 2 4 5.50 01/14/1999 28 119410 4220 Average 4410 Sample location: 180' West of east curb & 20' north of south curb. This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 4 CONCRETE COMPRi, SSIVE STRENGTH Date of Service: 12/17/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. ARm David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9833941 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 01/18/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/17/1998 BATCH TIME: 8:23am TIME SAMPLED: 9:20am BY: Eddie Elrod WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 5 1 F CONCRETE: 67 F TRUCK NO: 756 TICKET NO: 155342 AIR CONTENT (%): N/A UNIT WEIGHT (pct): N/A PLACEMENT LOCATION: Sec page I SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 250 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 12/24/1998 7 103330 3650 3 2 5.00 ! 2/24/1998 7 92650 3280 Average 3470 3 3 5.00 01 / 14/1999 28 139590 4940 3 4 5.00 01/14/1999 28 132280 4680 Average 4810 Sample location: 275' West of East curb & 25' west of south curb. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 4 .CONCRETE COMPS, SIVE STRENGTH Date of Service: 12/17/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: Project No.: Project: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9833941 43-2170-98 Lakeview Center Coppell, Texas Report Date 01/18/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM Co 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENTDATE: 12/17/1998 BATCHTIME: 9:45am TIME SAMPLED: 10:55am BY: Eddie Elrod WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 852 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 Clear 58 F CONCRETE: 72 TICKET NO: 155362 UNIT WEIGHT (pc0: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 5.50 4 2 5.50 4 3 5.50 4 4 5.50 Sample location: 360' West REPORT OF TESTS DATE AGE TESTED (days) 12/24/1998 7 12/24/1998 7 01/14/1999 28 01/14/1999 28 of east curb & 25' north MAXIMUM LOAD (lbs. furce) 103720 98300 Average 134670 136010 Average of south curb. ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3670 3480 3580 4760 4810 4790 350 FRACTURE TYPE Technician: Eddie Elrod Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (!) HalffAssociates (1) Mullen & Powell Technistructures, I Started: 3:00am (1) Butler Construction (1) City of Coppell (1) City of Coppell Finished: 1:00pm H~ Eng~ Eugene Harbour Vice President This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4 CONCRETE COMPRESSIVE STRENGTH Date of Service: 01/07/1999 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9901424 43-2170-98 Report Date 01/18/1999 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CO~rmACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer l~L~rr: 22 SPECIFICATION REQUIREMENTS STREN(gTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 30' North of SW comer CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.00 1 2 5.00 1 3 5.00 1 4 5.00 DATE TESTED 01/14/1999 01/14/1999 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 01/07/1999 BATCH TIME: 10:03am TIM~ SAMPLED: 10:50am BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUC~NO: 841 AIR co~r~r, rr (%): N/A PLACEMENT LOCATION: Cool and cloudy 46 F CONCRETE: 59 TIC~C~T NO: 156782 uNrr WEIGHT (pcf): N/A West side of building leaveouts slab REPORT OF TESTS ACCUMULATIVE YARDS: 30 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 83130 2940 7 86630 3060 Average 3000 02/04/1999 28 02/04/1999 28 FRACTURE TYPE Technician: Terry L. Smith Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, 1 Started: 10:00am Finished: (1) Butler Construction (1) City of Coppell (1) City of Coppell 12:00p ~ ~~~l~ Eugene Harbour Vice President This report is exclusively for the use of the client indical~l above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1