Loading...
Park West CC(7)-LR 990111,-CONCRETE COMPRESSIVE STRENGTH Date of Service: 12/30/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9835048 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 01/11/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 19 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:40am WEATHER CONDITIONS: TRUCK NO: 1823 AIR CONTENT (%): 4.6 PLACEMENT LOCATION: Northeast comer parking lot 9351 12/30/1998 BATCH TIME: 8:20am aY: Mario Villanueva Clear 46 F CONCRETE: 65 F TIC~T NO: 157884 UNIT WEIGHT (pe0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 01/06/1999 7 66900 2370 1 2 5.00 01/06/1999 7 72650 2570 Average 2470 1 3 5.00 01/27/1999 28 ~-~ 1 4 5.00 01/27/1999 28 Sample location: 50' North, 60' east of northeast corner of building. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 3 CONCRETE COMPR SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/30/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9835048 43-2170-98 Lakeview Center Coppell, Texas Report Date 01/11/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 19 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/30/1998 BATCH TIME: 10:15am TIME SAMPLED: 11:45am BY: Marlo Villanueva WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 373 AIR CONTENT (%): 4.9 PLACEMENT LOCATION: See page I Clear 45 F CONCRETE: 66 F TICKETNO: 156582 UNIT WEIGHT (pc0: N/A SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 I 5.25 01/06/1999 7 87200 2 2 5.25 01/06/1999 7 88630 Average 2 3 5.25 01/27/1999 28 2 4 5.25 01/27/1999 28 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3080 3130 3110 110 FRACTURE TYPE Sample location: 100' South, 20' east of northeast corner of building. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 3 -CONCRETE COMPR SIVE Date of Service: 12/30/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: DavidGlass 3890 W. Northwest Hwy. Dallas TX 75220 STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9835048 Project No.: 43-2170-98 Report Date 01/11/1999 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 19 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/30/1998 BATCH TIME: 2:45pm TIME SAMPLED: 3:25pm BY: Marlo Villanueva WEATHER CONDITIONS: Clear TEMPERATURE(F) ~ AIR 58 F CONCRETE: 69 V TRUCK NO: 852 TICKET NO: 157931 AIR CONTENT (%): 4.7 UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.00 01/06/1999 3 2 5.00 01/06/1999 REPORT OF TESTS ACCUMULATIVE YARDS: 220 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 85320 3020 7 90460 3200 Average 3110 3 3 5.00 01/27/1999 28 3 4 5.00 01/27/1999 28 FRACTURE TYPE Sample location: 200' South, 70' east of northeast corner of building. Technician: Marlo Viilanueva Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, ! Started: 8:30am (1) Butler Construction (1) City of Coppell (I) City of Coppell Finished: 4:30pm ~ E~j. mg, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3