Loading...
Park West CC(7)-LR 990108REPORT OF STRUCIr ' L STEEL INSPECtiON ENGINEERING, INC, 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/29/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9835253 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 01/08/1999 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. The following items have been inspected on the roof level framing. Between column lines G to L and 1 to 10: 1. Column anchor bolts unable to visually inspect because block outs full of water. 2. Joist and joist girder seat welds determined to be compliant. 3. Joist bridging determined to be compliant. 4. Welded connections at beam double clip to tilt wall embed plates, welds determined to be compliant. 5.Bolted connections, missing bolts found at column cap plate to beam along line I-2 to I-3. - 6. Perimeter metal deck support angle not complete at this time. Between column lines G to A and 1 to 10: 1. Metal deck installation, non-compliant puddle welds and side lap screws were marked accordingly with red paint. Technician: Larry Peel Report Distribution: (l) Prentiss Properties Limited, Inc. (l) Alliance Architects, inc. (1) Halff Associates (1) Mullen & Powell Technistructures, l (1) Butler Construction (1) City of Coppell (1) City of Coppell Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99TMP Page I of 1