Loading...
Park West CC(7)-LR 981229. ONCRETE COMPRE IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Da!la% Texas 75247 )ate of Service: 12/17/1998 Report No.: 9833941 Client No.: 71765000 Project No.: 43-2170-98 Report Date 12/29/1998 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3890 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTh: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/17/1998 RATC~I TIME: 4:20am TIME SAMPLEO: 5:50am BY: Eddie Elrod WEATHIgR CONDITIONS: TEMPERATURE (F). AIR TRUCK NO: 802 AIR CONTENT (%): N/A PLACEMENT LOCATION: Clear 46 F CONCRETE: 70 TICKET NO: 155320 UNIT WEIGHT (pet'): N/A South parking lot building 1,395' west from east curb SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 160 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.75 12/24/1998 7 76700 2710 1 2 5.75 12/24/1998 7 78030 2760 Average 2740 1 3 5.75 01/14/1999 28 1 4 5.75 01/14/1999 28 Sample location: 50' W of east curb & 20' N of S curb. This report is exclusively for ~ae use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ,~ v Paee I of 4 ONCRETE COMPRE 'olVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 )ate of Service: Client No.: Client: 12/17/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9833941 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 12/29/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: rEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer ~'LANT: 22 SPECIFICATION REQUIREMENTS STRI~IGTIt: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 935 1 PLA¢~MV. NT DATE: 12/17/1998 BATCI~ TIM~: 6:45am TIME SAMPLED: 7:50am BY: Eddie Elrod WEATHER CONDITIONS: Clear TEMPERATURE 09- AIR 49 TmJCKNO: 846 AIR CON~NT (%): N/A PLACEMENT LOCATION: See page I v coscRETE: 66 F TICKET NO: 155332 UNIT WEIGHT (pcf): N/A CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 5.50 12/24/1998 2 2 5.50 12/24/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 89460 3160 7 90400 3200 Average 3180 2 3 5,50 01/14/1999 28 2 4 5.50 01/14/1999 28 180 FRACTURE TYPE Sample location: 180' West of east curb & 20' north of south curb. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. P.oo '), nf/I 2ONCRETE COMPRE olVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 )ate of Service: Client No.: Client: 12/17/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9833941 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 12/29/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STREN(~I: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/17/1998 BATCH T~VIE: 8:23am TIME SAMPLEO: 9:20am BY: Eddie Elrod WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 5 1 F CONCRETE: 67 F TRVCKNO: 756 Ticr~r NO: 155342 Am CONTENT (%): N/A uwrr WEIGHT (pcf): N/A PLACEMENT LOCATION: See page I REPORT OF TESTS ACCUMULATIVE YARDS: 250 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 12/24/1998 7 103330 3650 3 2 5.00 12/24/1998 7 92650 3280 Average 3470 3 3 5.00 01/14/1999 28 3 4 5.00 01/14/1999 28 Sample location: 275' West of East curb & 25' west of south curb. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Paoe 3 nf 4 3ONCRETE COMPRES' IVE STRENGTH TES )ate of Service: 12/17/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 9833941 43-2170-98 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/29/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: YEST METHOD: UONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer ~I~NT: 22 ~PECIFICATION REQUIREMENTS S~,~N(~TH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 12/17/1998 BATCH TIME: 9:45am TIM~ SAMPLED: 10:55am BY: Eddie Elrod WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 852 Am CONTENT (%): N/A PLACEMENT LOCATION: Sec page 1 Clear 58 F CONCRETE: 72 TICKET NO: 155362 UNIT wEiG~rr (pc0: N/A SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inch.) TESTED (days) (lbs. force) 4 1 5.50 12/24/1998 7 103720 4 2 5.50 12/24/1998 7 98300 Average 4 3 5.50 01/14/1999 28 4 4 5.50 01/14/1999 28 ACCUMULATIVE YARDS: 350 COMPRESSIVE STRENGTH (~ 3670 3480 3580 Sample location: 360' West of east curb & 25' north of south curb. Technician: Eddie Elrod Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technisa'uctures, ! Started: 3:00am (1) Butler Construction (1) City of Coppell (1) City of Coppell Finished: l:00pm ~ Engin~l~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ,, ~ Pace 4 of 4