Park West CC(1)-LR 950419reed engineering
GI~OTECHNICAL CONSULTAN¥5
April 19, 1995
Project No. 2166.2
Report No. 2
Marc Myers Company
3811 Turtle Creek Boulevard, Suite 1020
Dallas, Texas 75219
ATTN: Mr. Richard Crow
Re:
Construction Materials Testing
Park West Commerce Center
Airline Drive and Executive Drive
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses the activities of April 14, 1995.
On the referenced date, five field density tests were taken on the
natural fill placed on the building pad. Test results are shown on
Plate 1. Where tested, materials were found to be in compliance with
project specifications.
Additional reports will be submitted as the work progresses.
have any questions, do not hesitate to call.
If you
Sincerely,
Ronald F. Reed, P.E.
BTL/RFR/msm
copies submitted:
(1) Marc Myers Company/Mr. Richard Crow
~1) McFadden & Miller/Mr. Dave Vandemeer
(1) comerica Band/Mr. Alan Williams
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019
reed eng!neering
PARK WEST COMMERCE CENTER
AIRLINE DRIVE AND EXECUTIVE DRIVE
COPPELL, TEXAS
REPORT NO. 2
Date
04-14-95
Field Density Tests
Depth
Below Unit
Final Dry
Test S.G. Weight
No. Location(1) (feet) (pcf)
36 300'S, 30'W
37 200'S, 30'W
38 100'S, 30'W
39 75'S, 75'W
40 175'S, 75'W
Com-
pac-
Moisture tion
Content Curve Level
(%) No. (%)
1.5 90.1 29.7 1 93.0
1.5 91.8 26.3 1 94.7
2.4 91.1 28.3 1 94.0
2.5 92.2 27.7 1 95.1
1.5 87.0 30.5 2 96.9
Footnote:
(1)
Measurements referenced from N.E. corner of
building pad.
GEOTECHNICAL CONSULTANTS --
PLATE 1