Loading...
Park West CC(1)-LR 950419reed engineering GI~OTECHNICAL CONSULTAN¥5 April 19, 1995 Project No. 2166.2 Report No. 2 Marc Myers Company 3811 Turtle Creek Boulevard, Suite 1020 Dallas, Texas 75219 ATTN: Mr. Richard Crow Re: Construction Materials Testing Park West Commerce Center Airline Drive and Executive Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities of April 14, 1995. On the referenced date, five field density tests were taken on the natural fill placed on the building pad. Test results are shown on Plate 1. Where tested, materials were found to be in compliance with project specifications. Additional reports will be submitted as the work progresses. have any questions, do not hesitate to call. If you Sincerely, Ronald F. Reed, P.E. BTL/RFR/msm copies submitted: (1) Marc Myers Company/Mr. Richard Crow ~1) McFadden & Miller/Mr. Dave Vandemeer (1) comerica Band/Mr. Alan Williams 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 reed eng!neering PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 2 Date 04-14-95 Field Density Tests Depth Below Unit Final Dry Test S.G. Weight No. Location(1) (feet) (pcf) 36 300'S, 30'W 37 200'S, 30'W 38 100'S, 30'W 39 75'S, 75'W 40 175'S, 75'W Com- pac- Moisture tion Content Curve Level (%) No. (%) 1.5 90.1 29.7 1 93.0 1.5 91.8 26.3 1 94.7 2.4 91.1 28.3 1 94.0 2.5 92.2 27.7 1 95.1 1.5 87.0 30.5 2 96.9 Footnote: (1) Measurements referenced from N.E. corner of building pad. GEOTECHNICAL CONSULTANTS -- PLATE 1