Loading...
Park West CC(7)-LR 981224REPORT OF STRUCT, RAL STEEL INSPECT ' N 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/15/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9833425 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 12/24/1998 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection on the roof level framing between lines A to D, 1 to 10 and lines D to H, 1 to 4. The results are as follows. 1. Column anchor bolts were unable to be inspected due to diamond being full of water. 2. Joist and joist girder seat welds were determined to be compliant. 3. Joist bridging was determined to be compliant with exception at the side walls. 4. Deck perimeter support angle not complete at splice locations. 5. Column to joist girder moment connection strap plate welds were determined to be compliant at lines H-3, H-2, G-3, G-2, F-3, F-2, E-3 and E-2. 6. Field fixes at lines D-4 and C-1 and joist girder shim plates were determined to be compliant. Technician: Larry Peel Report Distribution: (I) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I (1) Butler Construction (1) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SS Pa~e 1 of 1