Park West CC(1)-LR 950511reed engineering
GEOTEcHNICAL CONSULTANTS
May 11, 1995
Project No. 2166.2
Report No. 3
Marc Myers Company
3811 Turtle Creek Boulevard, Suite 1020
Dallas, Texas 75219
ATTN: Mr. Richard Crow
Re:
Construction Materials Testing
Park West Commerce Center
Airline Drive and Executive Drive
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses the activities of April 27 and 28, 1995.
On the referenced dates, a total of nine field density tests were
taken on the natural fill placed within the proposed building pad.
Test results are shown on Plate 1.. Where tested, materials were
found to be in compliance with project specifications.
Additional reports will be submitted as the work progresses.
have any questions, do not hesitate to call.
I f you
Sincerely,
REED ENGINEERING GRQ~INC.
BTL/RFR/msm
copies submitted:
(1) Marc Myers Company/Mr. Richard Crow
~1) McFadden & Miller/Mr. Dave VanDemeer
(1) C0merica Band/Mr. Alan Williams~
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 =' 214/350-5600 · (FAX) 214/350-0019
reed engineeri_ng
Date
04-27-95
04-28-95
Test
No.
41
42
43
44
45
46
47
48
49
Footnote:
PARK WEST COMMERCE CENTER
AIRLINE DRIVE AND EXECUTIVE DRIVE
COPPELL, TEXAS
REPORT NO. 3
Field Density Tests
Location (1)
Depth
Below Unit
Final Dry
S.G. Weight
(feet) (pcf)
50'S
50'S
150'S
250'S
350'S
75'S
175'S
250'S
300'S
80'W
225'W
225'W
225'W
225'W
225'W
225'W
225'W
225'W
2 5
3 0
2 9
2 5
2 0
2 0
2 0
2 0
2 0
91 3
86 9
93 4
86 0
90 2
86 6
87 2
86 2
86 0
Moisture
Content Curve
(%) No.
24 8
31 8
26 0
31 0
26 9
29 9
3O 7
31 0
32 6
1
2
1
2
1
2
2
2
2
Com-
pac-
tion
Level
(%)
94 2
96 8
96 4
95 8
93 1
96 4
97 1
96 0
95 8
(i)
Measurements referenced from N.E. corner of
building pad.
GEOTECHNICAL CONSULTAN~ ·
PLATE I