Loading...
Park West CC(1)-LR 950511reed engineering GEOTEcHNICAL CONSULTANTS May 11, 1995 Project No. 2166.2 Report No. 3 Marc Myers Company 3811 Turtle Creek Boulevard, Suite 1020 Dallas, Texas 75219 ATTN: Mr. Richard Crow Re: Construction Materials Testing Park West Commerce Center Airline Drive and Executive Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities of April 27 and 28, 1995. On the referenced dates, a total of nine field density tests were taken on the natural fill placed within the proposed building pad. Test results are shown on Plate 1.. Where tested, materials were found to be in compliance with project specifications. Additional reports will be submitted as the work progresses. have any questions, do not hesitate to call. I f you Sincerely, REED ENGINEERING GRQ~INC. BTL/RFR/msm copies submitted: (1) Marc Myers Company/Mr. Richard Crow ~1) McFadden & Miller/Mr. Dave VanDemeer (1) C0merica Band/Mr. Alan Williams~ 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 =' 214/350-5600 · (FAX) 214/350-0019 reed engineeri_ng Date 04-27-95 04-28-95 Test No. 41 42 43 44 45 46 47 48 49 Footnote: PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 3 Field Density Tests Location (1) Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 50'S 50'S 150'S 250'S 350'S 75'S 175'S 250'S 300'S 80'W 225'W 225'W 225'W 225'W 225'W 225'W 225'W 225'W 2 5 3 0 2 9 2 5 2 0 2 0 2 0 2 0 2 0 91 3 86 9 93 4 86 0 90 2 86 6 87 2 86 2 86 0 Moisture Content Curve (%) No. 24 8 31 8 26 0 31 0 26 9 29 9 3O 7 31 0 32 6 1 2 1 2 1 2 2 2 2 Com- pac- tion Level (%) 94 2 96 8 96 4 95 8 93 1 96 4 97 1 96 0 95 8 (i) Measurements referenced from N.E. corner of building pad. GEOTECHNICAL CONSULTAN~ · PLATE I