Loading...
Park West CC(7)-LR 981208· CONCRETE COMP SIVE STRENGTH Date of Service: Client No.: 11/04/1998 Report No.: 9829989 71765000 Project No.: 43-2170-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/08/1998 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and east compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 5:40am WEATHER CONDITIONS: TEMPERATURE (F) - AIR 50 TRUCK NO: 842 AIR CONTENT (%): N/A PLACEMENT LOCATION: Panels 17-53 9337 11/04/1998 BATCHTIME: 5:00am BY: Eddie Elrod Cloudy F CONCRETE: 67 v TlCm~T NO: 088971 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: Panel 28 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 6.50 11/! 1/1998 7 94490 3340 1 2 6.50 11/11/1998 7 90680 3210 Average 3280 I 3 6.50 12/02/1998 28 105740 3740 1 4 6.50 12/02/1998 28 104120 3680 Average 3710 160 FRACTURE TYPE This report is exclusively for thc usc of thc client indicated above and shall not be reproduced cxccpt in full without thc written approval of HBC Engineering, Inc. 0ILL Page I of 4 CONCRETE COMPR? SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/04/1998 71765000 Prentiss Properties Limited, Inc. Attn: DavidGlass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9829989 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 12/08/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 6:45am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 518 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I 9337 11/04/1998 BATCH TIME: 5:46am BY: Eddie Elrod Cloudy 53 F CONCRETE: 70 F TICKET NO: 088977 UNIT WEIGHT (pc0: N/A SAMPLE LOCATION: Panel 41 REPORT OF TESTS ACCUMULATIVE YARDS: 220 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.75 11/11/1998 7 92880 3280 2 2 5.75 11/11/1998 7 95550 3380 Average 3330 2 3 5.75 12/02/1998 28 120210 4250 2 4 5.75 12/02/1998 28 125530 4440 Average 4350 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 4 CONCRETE COMPResSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/04/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Report No.: 9829989 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 12/08/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 11/04/1998 BATCH TIME: N/A T~MESAMPLED: 8:40am BY: Eddie Elrod WEATHER CONDITIONS: Cloudy TEMPERATURE (F)-AIR 52 F CONCRETE: 67 TRUCK NO: 855 TICKET NO: 088987 AIR CONTENT {%): N/A UNIT WEIGHT (peO: N/A PLACEMENT LOCATION: See apge I SAMPLE LOCATION: Panel 49 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 1 6.50 11/11/1998 7 76090 2690 3 2 6.50 11/11/1998 7 75200 2660 Average 2680 3 3 6.50 12/02/1998 28 140330 4960 3 4 6.50 12/02/1998 28 144490 5110 Average 5040 320 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILL Page 3 of 4 ,CONCRETE COMPResSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/04/1998 71765000 Report No.: 9829989 Project No.: 43-2170-98 Report Date 12/08/1998 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3890 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 21 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 5.25 4 2 5.25 4 3 5.25 4 4 5.25 DATE TESTED 11/11/1998 11/11/1998 12/02/1998 12/02/1998 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:30am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 771 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 9337 11/04/1998 BATCH TIME: 8:15am BY: Eddie Elrod Cloudy 53 F CONCRETE: 68 F TICKET NO: 088995 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 410 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 88530 3130 7 86790 3070 Ave rage 3100 28 129810 4590 28 131490 4650 Average 4620 FRACTURE TYPE Technician: Eddie Elrod Report Distribution: (1) Prentiss Properties Limited, inc. (!) Alliance Architects, Inc. (I) Halff Associates (i) Mullen & Powell Technistructures, l Started: 4:00am (1) Butler Construction (1) City of Coppell (1) City of Coppell Finished: 2:00pm H~ E~ing, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. 0ILL Page 4 of 4