Loading...
Park West CC(7)-LR 981204CONCRETE COMPResSIVE STRENGTH 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/19/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9831424 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 12/04/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTU: 3500 psi ~ 28 Days 4-6" N/A ASTM C-143 ASTM C-143 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 7:10am WEATHER CONDITIONS: TEMPERATURE (F) -AIR TRUCK NO: 725 AIR CONTENT (%): N/A PLACEMENT LOCATION: 9337 11/19/1998 BATCH TIME: 4:50am BY: B.J. Clark Cloudy, cool 62 v CONCRETE: 69 F TICKET NO: 84612 UNIT WEIGHT (pc0: N/A Panels 1,2, 3, 4, 71,4, 75, 58, 73, 72 SAMPLE LOCATION: Panel 74 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED' MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.25 11/26/1998 7 80870 2860 1 2 5.25 11/26/1998 7 85820 3030 Average 2950 1 3 5.25 12/17/1998 28 1 4 5.25 12/17/1998 28 100 FRACTURE TYPE Concrete was very old and contractor was notified and decided to use the mud and wet it up anyway, pour started at 4:00am but was scheduled for 7:00am. Concrete was pumped, sample taken from truck. Technician: B.J. Clark Started: 6:00am Finished: 9:00am ~ En ' Report Distribution: (1) Prentiss Properties Limited, Inc. (I) Butler Construction (1) Alliance Architects, Inc. (1) City of Coppell Eugene Harbour (1) Halff Associates (I) City of Coppell Vice President (I) M ullen & Powell Technistructures, I This report is exclusively for the use of the client indicated abov9 and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I