Loading...
Park West CC(7)-LR 981130CONCRETE COMP SIVE Date of Service: 10/27/1998 Client No.: 71765000 STRENGTH Report No.: 9829237 Project No.: 43-2170-98 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 11/30/1998 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACrOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier I/6.4 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.75 1 2 5.75 1 3 5.75 Technician time: See DATE TESTED 11/04/1998 11/25/1998 11/25/1998 Report %9829236 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/28/1998 BATCH TIME: 2:45pm TIME SAMPLED: 3:30pm aY: Mike Shields WEATHER CONDITIONS: Cloudy TEMPERATURE (F)- AIR 80 F CONCRETE: 83 F TRUCK NO: 760 TICKET NO: 834 AIR CONTENT (%): N/A UNIT WEIGHT (pct'): N/A PLACEMENT LOCATION: Piers- H.6/;7, G.9/4, I/7, I/6.4, 1.5/5, 1.2/4.2Pier !/ REPORT OF TESTS ACCUMULATIVE YARDS: 20 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi} 7 104630 3700 28 127310 4500 28 130440 4610 Average 4560 Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) HalffAssociates (I) Mullen & Powell Technistructures, I Started: Finished: (1) Butler Construction (1) City of Coppell (I) City of Coppell H~ Engin~l~. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I