Loading...
Park West CC(7)-LR 981124CONCRETE COMPRE' IVE STRENGTH Date of Service: 10/23/1998 Report No.: Client No..' 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9828899 43-2170-98 Lakev~w Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/24/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 5"-7" N/A ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/23/1998 BATCH TnWE: 10:12 am Tram SAMeLWD: 10:48 am BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 756 Am CONTENT (%): N/A PLACEMENT LOCATION: Piers - See Report #9828898 Cloudy and cool 71 F CONCRETE: 66 TICKETNO: 111849 UNITWEIGHT(~: N/A SAMPLE LOCATION: Piers A/l, A/I.8, A/2.2 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.00 1 2 5.00 1 3 5.00 1 4 5.00 See Report #9828898 Technician: Terry L. Smith Report Distribution: (1) Prcntiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Teclmislructures, I REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 10/30/1998 7 113930 4030 10/30/1998 7 111.520 3940 Average 3990 11/20/1998 28 153240 5420 11/20/1998 28 148370 5250 Average 5340 for Start and Stop time. Started: Finished: (!) Butler Construction (1) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated abov~ and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OITM Page 1 of 1 .CONCRETE COMPRESSIVE STRENGTH Date of Service: 11/12/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9830765 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/24/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4-6" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 11/12/1998 BATCH TIME: 3:50am TIME SAMPLED: 4:45am BY: B.J. Clark WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1882 AIR CONTENT (%1: N/A PLACEMENT LOCATION: Cloudy, cool 48 V CONCRETE: 59 V TICKET NO: 84304 UNIT WEIGHT (pc0: N/A Panels 2-16, 53, 55, 56, 57, 59, 60, 61, 62, 70 SAMPLE LOCATION: Panel 14 REPORT OF TESTS ACCUMULATIVE YAm)S: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.50 11/19/1998 7 90890 3210 ! 2 5.50 11/19/1998 7 87350 3090 Average 3150 1 3 5.50 12/10/1998 28 I 4 5.50 12/10/1998 28 OILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 3 .CONCRETE COMPR " SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/12/1998 Client No.: 71765000 Client: Prentiss Properties Limited, lac. Attn: DavidGlass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9830765 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 11/24/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRZNGTH: 3500 psi ~ 28 Days 4-6" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 11/12/1998 BATCH TIME: 4:23am TIME SAMPLED: 5:20am BY: B.J. Clark WEATHER CONDITIONS: Cloudy, cool TEMPERATURE (F) - AIR 48 g CONCRETE: 60 V TRUCK NO: 853 TICKET NO: 84312 AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: Panel 3 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 2 1 4.25 2 2 4.25 2 3 4.25 2 4 4.25 DATE TESTED 11/19/1998 11/19/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 76420 2700 7 76630 2710 Average 2710 12/10/1998 12/10/1998 28 28 110 FRACTURE TYPE 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 3 CONCRETE COMPRx SIVE STRENGTH Date of Service: 11/12/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9830765 43-2170-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/24/1998 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLA~r: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4-6" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 11/12/1998 BATCHTIME: 5'10am TIME SAMPLED: 7:00am aY: B.J. Clark WEATHER CONDITIONS: Cloudy, cool TEMPERATURE (F)-AIR 50 F CONCRETE: 52 F TRUCK NO: 725 TICKZT NO: 84321 AIR CONTENT (%): N/A UNIT WEIGHT (pcl): N/A PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: Panel 57 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.00 11/19/1998 3 2 5.00 11/19/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 200 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 73680 2610 7 70670 2500 Average 2560 3 3 5.00 12/10/1998 28 3 4 5.00 12/10/1998 28 FRACTURE TYPE Concrete was pumped, sample taken from truck. Some of the concrete between 180 and 260 was old, contractor notified technician to place concrete. Technician: B.J. Clark Report Distribution: (l) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, i Started: 3:00am (1) Butler Construction (1) City of Coppell (l) City of Coppell Finished: 10:30am Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3