Loading...
Park West CC(7)-LR 981119CONCRETE COMPRI SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 11/11/1998 Report No.: 9830655 11/19/1998 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3860 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4-6" 3-5% ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 11/11/1998 BATCH TIME: 6:05am TIME SAMPLEO: 6:35am BY: B.J. Clark WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 853 AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving Clear, cool 39 ~' CONCRETE: 48 F TICm~T NO: 84228 UNIT WEIGHT (pcf}: N/A SAMPLE LOCATION: 20' S & 0' E of NW comer of paving REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 7.50 11/18/1998 7 73830 2610 1 2 7.50 11/18/1998 7 76050 2690 Average 2650 1 3 7.50 12/09/1998 28 1 4 7.50 12/09/1998 28 01LL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 2 CONCRETE COMPRf'SIVE STRENGTH 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 11/11/1998 Report No.: 9830655 Client No.: 71765000 Project No.: 43-2170-98 Report Date 11/19/1998 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3860 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4-6" 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 11/11/1998 BATCH TIME: 6:40am TIME SAMPLED: 7:30am BY: B.J. Clark WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1882 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sec page 1. Clear, cold 41 F CONCRETE: 52 F TICKET NO: 84237 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: 32' N & 5' E of SW comer of paving CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 2 1 6.25 2 2 6.25 2 3 6.25 2 4 6.25 REPORT OF TESTS DATE AGE TESTED (days) 11/18/1998 7 11/18/1998 7 12/09/1998 28 12/09/1998 28 MAXIMUM LOAD (lbs. force) 95020 90750 Average ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3360 3210 3290 140 Sample taken from truck. Technician: B.J. Clark Report Distribution: (1) Prentiss Properties Limited, Inc. (I) Alliance Architects, lac. (I) Halff Associates (I) Mullen & Powell Technistructures, Started: 5:00am Finished: 10:30am (I) Butler Construction (I) City of Coppell (1) City of Coppell Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2